<br />.
<br />
<br />.
<br />
<br />.
<br />
<br /> E. RESUMES OF KEY PERSONNEL
<br /> (Complete one Section E for each key person)
<br />12. NAME 13 ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Aris Garcia, AlA Project Manager
<br />Vice President a. TOTAL I b. WITH CURRENT FIRM
<br /> 23 19
<br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />1983 / Bachelor of Architecture / University of Miami Registered Architect / Florida #AR15263
<br />Graduate studies toward Masters of Urban Planning Interior Designer / Florida # 103665
<br /> NCARB Certification #65628
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards, Ere.)
<br /> 19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (Cdy and Stale) (2) YEARS COMPLETED
<br /> Suniland Park, Village of Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2002 2003
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Manager for the design of 10 acres of active park space including the addition of a Community Center, housing a multipur
<br />pose assembly room, concessions area, administration offices and restroom facilities. Additional park areas dedicated to a Rec-
<br />reation Center, multipurpose athletic fields (baseball and football), batting cages, basketball courts, an Internet Wi-Fi Spot and a tot lot.
<br />X Check if Proiect performed with current firm.
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> Evelyn Langlieb Greer Park, Village of Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2004
<br /> 2003
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Manager for the design of this new 10-acre park for the Village of Pinecrest, Florida. The park includes a 5,000 SF Commu-
<br />nity Center consisting of an activity room, public restrooms, administrative park offices, a snack shop, a large recreation shelter for public
<br />gatherings, a covered children's playground, two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with
<br />fitness stations, and parking for 140 vehicles.
<br />X Check if Project performed with current firm.
<br />c. (1) TITLE AND LOCATION (Cdy and Stale) (2) YEARS COMPLETED
<br /> VA Medical Center and Parking Garage, West Palm Beach, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 1992 1994
<br />(3) BRIEF DESCRIPTION (Briel Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Manager for the design for the 400-bed center (340 medical/surgical beds and 60 psychiatric beds) includes all adjunct support.
<br />ing facilities including radiology, laboratories, therapy, pharmacies, food service, medical records, storage and administrative offices.
<br />Also included are a three-level parking garage, totaling more than 500,000 SF, with space for more than 800 vehicles
<br />X Check if Project performed with current firm.
<br />d. (1) TITLE AND LOCATION (Cdy and Stale) (2) YEARS COMPLETED
<br /> Sunset Place Retail and Parking Garage Expansion PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> South Miami, FL 1997 1998
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project manager for the parking garage expansion. The incorporation of arcades, landscaped walks and plazas created an attractive,
<br />safe environment for both tourists and locals. WA served as the Architect and Engineer of Record for the redevelopment of a 700,000
<br />SF "urban destination" retail complex. These improvements were coordinated with the City of South Miami and its Hometown Plan.
<br />The expansion also included an addition to the existing parking garage to creating a 580,000 SF, eight-level structure for a total of
<br />1.700 parking spaces.
<br />X Check if Project performed with current firm.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br />Mary Brickell Village and Parking Garage
<br /> Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2005 2007
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project manager for the integrated mixed-use project, the parking garage at Mary Brickell Village provides 1,400 retail and residen.
<br />tial spaces on 8 floors with specific user zones allocated to 1. The retail component, 2. A 31,000 SF Publix, and 3, 24 floors of apart-
<br />ments above. In all, the project presents itself as the prototype for mixed use in-town living.
<br />X Check if Project performed with current firm.
<br />
<br />WOLFBERG ALVAREZ AND PARTNERS
<br />PAGE 3
<br />
<br />STANDARD FORM 330 (1/2004)
<br />
|