|
<br />.
<br />
<br />.
<br />
<br />.
<br />
<br />~'.' :;: . i;~" :::',' .
<br />
<br />"';)i'CiE;..~,E:SUMES OF,KEY.f'E~SONNElPROP~~I:rFOR.TH,I~. CO~~C.T:
<br />,:;:~,/:\ :;":':"',,/(COirij:ilete 'one"SeC6onE'for eaCh' key pe"isOii} ",:..,:;,/',Yi.'}':;,'"
<br />13. ROLE IN THIS CONTRACT
<br />Project Landscape Architect
<br />
<br />. ;. , .: " ,:~:>:;~:
<br />
<br />. ," ". . ~. I
<br />
<br />:....::.i
<br />
<br />12 NA.....E
<br />Christopher J. Cawley, RLA, ASLA
<br />
<br />a TOTAl
<br />
<br />14. YEARS EXPERIENCE
<br />I b. WITH C~RRENT FIRM
<br />
<br />7
<br />
<br />15, FIRM NAME AND LOCATION (Cily unci srure)
<br />O'Leary Richards Design Associates. Inc.
<br />
<br />16. EDUCATION (DEGREE AND SPECJAUZATION)
<br />Bachelor of Landscape Architecture
<br />University of Georgia, 1999
<br />
<br />Miami, Florida
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE: AND DiSCiPliNE)
<br />Florida. Landscape Architect
<br /># 6666786
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (PubllC8lions, Organizuoons, TflIining, Awan:fs, ete.)
<br />Member of the American Society of Landscape Architects, Member of Village ofBal Harbour Arch. Review Board, FL
<br />Inside Out Magazine - Biscayne Blvd. Competion, March 2006, The 2007 MiMo Award - The Fontana ]601 W.Ave., &
<br />Merit Bldg. Award for Comm. Renovation- The Vanderbilt, 810 Penn. Ave. from Miami Design Preservation League
<br />
<br /> .."",:,.";,;:',, "..;:."'.!";'.':",;
<br /> '..,.
<br /> (1) llTLE AND LOCATION (City and Slete) (2) YEAR COMPLETED
<br /> Waterways Park PROFESSIONAL SERVICES I CONSTRUCTION (II applicable)
<br /> A ventura, Florida 2006 Under Construction
<br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost, ele.) AND SPECIFIC ROLE ~ Check ~ projeC: performed with curren! firm
<br />a. Project Landscape Architect. This project involved all phases of Landscape Architectural design and construction
<br /> documentation for a new public park located in Aventura. Florida. Primary responsibilities include the design of the
<br /> hardscape paving areas, planting areas and coordination with the project's Civil Engineers and the City of Aventura.
<br /> (1) TITLE AND LOCATION (City anrJ State) (2) YEAR COMPLETED
<br /> Fifth and Alton Retail Development and Garage Streets cape PROFESSIONAL SERVICES I CONSTRUCTION (II appli,;able)
<br /> Miami Beach, Florida 2005 2007
<br /> (3) BRIEF DESCRlPTION (Brief scope, size. cost, elc.) AND SPECIFIC ROLE U Check n project pe:f=ed wit, curren: firm
<br />
<br />b.j Project Landscape Architect for a large parking garage and retail development in Miami Beach, Florida. Primary responsibilities
<br />included hardscape design, planting design, and the preparation of schematic plans and construction documents. Additional
<br />I responsibilities included the design of a large plaza and water feature meant to house a major piece of public artwork..
<br />
<br />
<br />(1) TITLE AND LOCATION (City a,'lCf State) (2) YEAR COMPLETED
<br />Miami Beach Marina Baywalk PROFESSIONAL SERVICES I CONSTRUCTION (If applicable}
<br />City of Miami Beach, Florida 2003-2005 2005
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, SIZe, cosl, ele.) AND SPECIFIC ROLE LJ Check ~ project pe:1orrned with curren! fm
<br />C. Project Landscape Architect and Project Manager for the complete redesign of a substantial portion of the existing
<br />Miami Beach Marina Baywalk. Primary responsibilities included the design of the hardscape paving areas, landscape
<br />I planting areas, and preparation of construction documents. Additional responsibilities included coordination with the
<br />I project's Civil Engineer and the City of Miami Beach.
<br />
<br />1(1) TITLE AND LOCATION (Cffyancf Slate) I (2l YEAR COMPLETED
<br />! Ocean Two Public Beach Access I PROFESSIONAL SERVICES /CONSTRUCTlON (If applicable)
<br />, Sunny Isles Beach, Florida 2003 2004
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE U Ched< n projeCl performed ....ith current firm
<br />d. Project Manager and Pr~iect Landscape Architect. This project involved the design, construction documentation, and
<br />construction supervision for the creation ofa new public beach access adjacent to Ocean II Condominium located on
<br />Collins Avenue. Primary responsibilities included design ofhardscape paving areas, native planting areas, and site
<br />amenities such as benches and lighting. Additional responsibilities included construction administration and
<br />coordination with the project Architect and General ContractoT.
<br />{1l TITLE AND LOCATION (Cdr IJfI!I Slat..) (2) YEAR COMPLETED
<br />South Miami Municipal Parking Garage PROFESSIONAL SERVICES i CONSTRUCTION (tfappllcable)
<br />City of South Miami, Florida 2007 i 2007
<br />
<br />(3) BRIEF DESCRIPTION (Snef scope. size, cos./., ete.) AND SPEC lAC ROLE . ~ Check if proj.d perlor:ned with CUNen! firm
<br />e'l Project Landscape Architect. This project involyed the design and construction documentation for three streetscapes
<br />I that encompass an entire City block in South Miami. Primary responsibilities included the design of the hardscape
<br />II paving areas, planting areas and coordination with the project's Civil Engineers, General Contractor and the City of
<br />South Miami. It also included presenting the project and obtaining approval from the City of South Miami's Historic
<br />Preservation Board.
<br />
<br />STANDARD FORM 330 (612004) PAGE 2
<br />
|