<br />.
<br />
<br />.
<br />
<br />.
<br />
<br /> E. RESUMES OF KEY PERSONNEL
<br /> (Comp/ete one Section E for each key person)
<br />12 NAME' 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Mario H. Gutierrez, PE Engineering Coordinator
<br />Vice President s. TOTAL I b WITH CURRENT FIRM
<br /> 37 24
<br />16 EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />BS /1969 / Mechanical Engineering / University of Southwestern Registered Engineer / Florida #19687
<br />Louisiana Registered Engineer / MD, VA, TX, AZ, CA & District of Columbia
<br />18. OTHER PROFESSIONAL QUALIfiCATIONS (Pubfications. Organizations. Training. Awards. Etc.)
<br />National Fire Protection Association
<br />American Society of Heating, Refrigeration and Air Conditioning Engineers (ASH RAE)
<br /> 19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> Suniland Park, Village of Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2002 2003
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Engineering Coordinator for the design of 10 acres of active park space including the addition of a Community Center, housing a
<br />multipurpose assembly room, concessions area, administration offices and restroom facilities. Additional park areas dedicated to
<br />a Recreation Center, multipurpose athletic fields (baseball and football), batting cages, basketball courts, an Internet Wi-Fi Spot and a tot
<br />lot.
<br />X Check if Project performed with current firm.
<br />b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> Evelyn Langlieb Greer Park, Village of Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Apphcable)
<br /> 2003 2004
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost. etc.) AND SPECIFIC ROLE
<br />Engineering Coordinator for the design of this new 10-acre park for the Village of Pinecrest, Florida. The park includes a 5,000 SF
<br />Community Center consisting of an activity room, public restrooms, administrative park offices, a snack shop, a large recreation shelter
<br />for public gatherings, a covered children's playground, two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path
<br />with fitness stations, and parking for 140 vehicles.
<br />X Check if Project performed with current firm.
<br />c. t1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> VA Medical Center and Parking Garage PROFESSIONAL SERVICES I CONSTRUCTION (If ApphcaOle)
<br /> West Palm Beach, FL 1992 1994
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Engineering Coordinator for the design for the 400-bed center (340 medical/surgical beds and 60 psychiatric beds) includes all adjunct
<br />supporting facilities including radiology, laboratories, therapy, pharmacies, food service, medical records, storage and administrative
<br />offices. Also included are a three-level parking garage, totaling more than 500,000 SF, with space for more than 800 vehicles
<br />X Check if Project performed with current firm.
<br />d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br /> Sunset Place Retail and Parking Garage Expansion PROFESSIONAL SERVICES I CONSTRUCTION (If Appl'caole)
<br /> South Miami, FL 1997 1998
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Engineering Coordinator for the parking garage expansion. The incorporation of arcades, landscaped walks and plazas created an
<br />attractive, safe environment for both tourists and locals. WA served as the Architect and Engineer of Record for the redevelopment of a
<br />700,000 SF "urban destination" retail complex. These improvements were coordinated with the City of South Miami and its Hometown
<br />Plan. The expansion also included an addition to the existing parking garage to creating a 580,000 SF. eight.level structure for a
<br />total of 1,700 parking spaces.
<br />X Check if Project performed with current firm.
<br />e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
<br />Mary Brickell Village and Parking Garage
<br /> Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2005 2007
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Engineering Coordinator for the integrated mixed-use project, the parking garage at Mary Brickell Village provides 1,400 retail and
<br />residential spaces on 8 floors with specific user zones allocated to 1. The retail component, 2. A 31,000 SF Publix, and 3. 24 floors
<br />of apartments above. In all, the project presents itself as the prototype for mixed use in-town living.
<br />X Check if Project performed with current firm.
<br />
<br />WOLFBERG ALVAREZ AND PARTNERS
<br />PAGE 5
<br />
<br />STANDARD FORM 330 (1/2004)
<br />
|