My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partnerss
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Wolfberg Alvarez & Partnerss
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:04 PM
Creation date
8/28/2008 11:40:29 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F lor each oroiect.) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />8 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Belen Area Drainage Improvements from SW 6th Street to <br />NE 6th Street and from SW 132nd Avenue to SW 118th Ave, <br />Miami-Dade, Florida <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> <br />2002-2005 <br /> <br />2004-2007 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Miami-Dade Count DERM <br /> <br />b. POINT OF CONTACT NAME <br />Mr. Alex Barrios, P.E. <br /> <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br />Civil Works provided civil and environmental engineering services. This design included drainage <br />improvements for a one and one-half square mile area funded by FEMA and Miami-Dade County. The <br />project included, a drainage analysis, stormwater modeling, and report for 23 basins, approximately 5 <br />miles of exfiltration trench, conveyance piping, two 100 Hp stormwater pump stations and two emergency <br />overflows to the adjacent canal. SFWMD Permits were also included. <br /> <br />. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />. <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Civil Works, Inc. Miami, Florida Civil Engineering <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.