My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McLeod Architectural Group, P.A.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
McLeod Architectural Group, P.A.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:04 PM
Creation date
8/29/2008 12:09:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br /> <br />a. TOTAL <br /> <br />b. WITH CURRENT FIRM <br /> <br />KENNETH E. GARDNER <br /> <br />PRINCIPLE <br /> <br />1 S. FIRM NAME AND LOCATION (City and State) <br />Rosenberg Gardner Design 5190 N.W. 167 St. Suite 111 Miami, FL 33014 <br /> <br />16. EDUCATION (DEGREE AND SPEClALlZA nON) <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />BLA, University of Georgia - 1991 <br /> <br />Florida - LA - 0001569 <br /> <br />18. OTHER PROFESSIONAL OUALlFICATIONS (Publications. Oroanizations, Trainino. Awards. etc.) <br /> <br />Member-American Society of Landscape Architects <br />Member-Builders Association of South Florida <br />Extensive experience in transportation related landscape <br />desian for FDOT and several municioalities <br /> <br />Taught Landscape Design at Miami Dade Community <br /> <br />College <br />Proficient in AutoCADD <br /> <br /> <br /> <br />(l) TITLE AND LOCATION (City and State) <br /> <br />Oceanfront Park <br />Sunny Isles Beach, FL <br /> <br />PROFFSSIONAI SFRVlrFS rONSTRIJrTION fif annlirahlp) <br /> <br />Landscape N/A <br />Architecture <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE <br />a. A 2-1/2 acre beachfront park featuring recreation/restroom <br />pavilion, pathways, boardwalk and dune restoration. As Prime <br />consultant, RGD prepared the master plan, construction documents <br />and contract administration for the entire project and coordinated <br /> <br />xx Check if project performed with current firm <br /> <br />tho ,,,,,,,.L- nf tho anninoorc ::lnrl ::u"rhitort <br /> <br />. <br /> <br />(1\ TITI F ANn I orATION (Oty and Statp) <br />Grapeland Park <br />NW. 37 Ave. and NW. 14 St. <br /> <br />Miami, FL <br /> <br /> <br />PROFFSSIONAI SFRVlrFS rONSTRIJrTION fif annlirahlp) <br /> <br />Landscape N/A <br />Architecture <br /> <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROL <br />Prepared planting and irrigation plans and site planning <br />consultations for a 21-acre park featuring a baseball complex, <br />large aquatic center featuring a lazy river, water play apparatus <br /> <br />xx Check if project performed with current firm <br /> <br />...........J ... .........4. L.._.................. 1-.....11 <br /> <br />tl \ TITI F ANn I orATION (Oty and Statp) <br /> <br /> <br />Claude Pepper Youth Center <br />1 400 NW 1 35 Street <br /> <br />PROFFSSIONAI SFRVlrFS rONSTRIJrTION (if annlirahlp) <br /> <br />Landscape N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br />c. <br /> <br />Community Center and Gymnasium, tennis courts, plaza and <br />parking lot at Claude Pepper Park. RGD prepared the planting and <br />irrigation plans for the project. <br /> <br />, <br />xx Check if project performed with current firm <br /> <br />tl) TITI F ANn I orATION (Oty and ~tatP) <br /> <br /> <br />Walker Park Community Center <br />2825 W. 8th Avenue <br /> <br />PROFFSSIONAI SFRVlrFS rONSTRIJrTION (if annlirahlpJ <br /> <br />Landscape N/A <br /> <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE <br /> <br />. <br /> <br />A new community center and parking lot in Walker Park. RGD <br />prepared planting and irrigation plans for the project. <br />Cost of Project: $ 1.7 Million Completion scheduled for 2007. <br /> <br />xx Check if project performed with current firm <br /> <br />(1) TIT! F ANn I orA TION (Oty and Statp) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.