My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Russell Partnership, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
The Russell Partnership, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:36:31 PM
Creation date
8/29/2008 12:57:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME: Luis M. Rodriguez, P.E., President <br /> <br />13. ROLE IN THIS CONTRACT: Principal-in-Charge <br /> <br />14a. YEARS EXPERIENCE - TOTAL: 32 <br /> <br />14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 18 <br /> <br />15. FIRM NAME AND LOCATION (City and State): Brill Rodriguez Salas & Associates, Inc., Miami, FL., 33173 <br />16. EDUCATION (DEGREE AND SPEC/ALlZA TlON): BSCE Louisiana State University, Civil Engineering. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE): P.E.#: 22132, State of Florida <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Mr. Rodriguez has a very <br />diversified background ranging from High-rise to residential structural design and investigations. Some of Mr. Rodriguez' <br />recent projects include various Broward County Memorial Hospital System projects including the Central Energy Plant, the <br />Neonatal Intensive Care Unit, hurricane enhancement of many of the buildings in the system and review and structural <br />remodeling of many of their facilities at several campuses. He has also reviewed and made recommendations and designs <br />for hurricane preparedness at Mercy Hospital in Miami, Tampa General Hospital, and Baptist Hospital System as well as <br />various projects for Naples Community Hospital. He has also recently designed structures for Miami-Dade Aviation <br />Department, Miami-Dade County Public Schools, Miami-Dade Community College and Homestead Air Reserve Base. <br /> <br />19a( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): HARB Recycling Building, Homestead, FL. <br />19a(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 <br />19a(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2004 <br />19a(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Structural Engineering <br />and Structural Design Services. <br />19a(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project perfonned with current FInn: <br /> <br />19b(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): HARB, Airfield Lighting and Vault, Homestead, FL. <br />19b(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 <br />19b(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2004 <br />19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Structural Engineering <br />and Structural Design Services. <br />19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project perfonned with current FInn: <br /> <br />19c(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Boy Scouts of America, Key West, FL. <br />19c(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 <br />19c(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): NIA <br />19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Structural Engineering <br />Services and Structural Design through construction administration for Counselor Housing. A three story concrete <br />facility with wood roof trusses, precast concrete joists and concrete masonry walls on piles. <br />19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project perfonned with current FInn: <br /> <br />19c( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): MHS, Memorial Hospital West, Pembroke Pines, FL. <br />19c(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 <br />19c(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): NIA <br />19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Structural Engineering <br />Services and Structural Design through construction administration including threshold inspections for an <br />Emergency Room Expansion. A three story reinforced concrete structure design for future expansion. Floor system <br />consisted of composite concrete on precast joists supported by conventionally reinforced beams and columns. The <br />structure included preparation for the installation of a heliport on the roof. <br />19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project perfonned with current FInn: <br /> <br />19c(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): MHS, Memorial Regional Hospital, Hollywood, FL. <br />19c(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 <br />19c(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): NIA <br />19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Structural Engineering <br />Services and Structural Design through construction administration including threshold inspections for the <br />Emergency Department. A two story RCS design for future 8 levels. Floor system consisted of composite concrete <br />on precast joists supported by conventionally reinforced beams and columns. <br />19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project perfonned with current FInn: <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.