Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />1 20, EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.L <br /> <br />9 <br /> <br />21 TITLE AND LOCATION (City and State) <br />N.W. 25th Street, Miami-Dade County, Florida <br /> <br />22 YEAR COMPLETED <br />- -- -~- <br />PROFESSIONAL SERVICES CONSTRUCTION (tf applicable) <br /> <br />2005 <br /> <br />TBD <br /> <br />L_ <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a, PROJECT OWNER : b POINT OF CONTACT <br />FOOT, District Six Jason Chang, P.E. <br />____ ~_ _L ___ _ <br />24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br /> <br />c POINT OF CONTACT TELEPHONE NUMBER <br />(305) 470-5331 <br /> <br />N.W. 25th Street from N.W. 87 Avenue to N.W. 67 Avenue <br />is a major reconstruction project. Marlin Engineering is the <br />prime consultant leading the final design of one of the <br />most important projects in Florida. This project will provide <br />the necessary ground access to the Miami International <br />Airport West Cargo Area. N.W. 25th Street will be <br />reconstructed to a six-lane urban section with a wide <br />median and dual left turn lanes. A four-lane, two-way <br />elevated roadway (viaduct) will be providing additional <br />capacity. This project is ranked as the highest priority <br />project on the Governor's list of projects to improve <br />economic development in Florida. <br /> <br />The surveying services for this project included <br />topography, digital terrain modeling, vertical control <br />verification, and reestablishment of points from Project <br />Network Control. <br /> <br />The scope of services included full design surveying for <br />the reconstruction and cross sections of N.W. 25 Street in <br />Miami-Dade County, Florida. <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />I (1) FIRM NAME <br />a. N/A <br />J <br />(1) FIRM NAME <br />b.1 <br /> <br />I (2) FIRM LOCATION (City and Slale) <br />I <br />I <br /> <br />, (3) ROLE <br /> <br />- -~ FIRM L-OCATION (City and State) <br /> <br />i (3) ROLE <br /> <br />-I (1) FIRM NAME <br />1 <br />c.j <br /> <br />I (2) FIRM LOCATION (City and State) <br />! <br /> <br />I (3) ROLE <br /> <br />I <br />-I (1) FIRM NAME <br /> <br />-i--- .u____ <br />(3) ROLE <br /> <br />: (2) FIRM LOCATION (City and Stale) <br />I <br /> <br />d., <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) ROLE <br /> <br />e. <br /> <br />-1.----- <br />I (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />, (3) ROLE <br /> <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 10 <br />