Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />o <br /> <br />- <br /> <br />12. NAME <br />Pete Diaz, PSM <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Surveying Manager a. TOTAL <br />20 <br /> <br />14. YEARS EXPERIENCE <br />I b. WITH C~RRENT FIRM <br /> <br />15. FIRM NAME AND LOCATION (City and Stale) <br />Marlin Engineering, Inc., Miami, Florida <br /> <br />16. EDUCATION (DEGREE AND SPECIAlIlA nON) <br />Degree Studies, Miami-Dade Community College <br />Miami, Florida 1984 <br />Member: Phi Theta Kappa Society <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida, Professional Surveyor and Mapper, <br />Registration # 6052 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, elc.) <br />N/A <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sunny Isles Blvd. (SR-826) from Intracoastal Waterway Bridge to PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> Collins Ave, Sunny Isles, Florida 2005 N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~J Check if project performed with current firm <br />This project entailed the collection of Topographic data with specific attention to drainage structures, establish a control <br /> network, Right of Way location. Mr. Diaz was the Survey Project Manager responsible for the direction of all survey <br /> activities. Contact Person: George Fischer, Project Manager & Grant Coordinator (305) 947-0606 <br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED <br /> NW 25 St from NW 87 Ave to NW 67 Ave, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2005 TBD <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE - ~ Check jf project performed with current firm <br />b. This project entailed the collection of Topography, DTM, Vertical control verification, reestablish points from control <br /> network, LayouULocate bore holes and relate to existing Baseline. Mr. Diaz was the Survey Project Manager responsible <br /> for the direction of all survey activities. Contact Person: Project Manager: Miguel Soria, P.E. (305) 477-7575 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Numerous sites throughout the City of Miami, Miami, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> 2005 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ID Check if project performed with current firm <br />c. This project entailed the collection of Topography, Vertical control verification, recover/reset City monuments as needed. <br /> Mr. Diaz was the Survey Project Manager responsible for the direction of all survey activities. Contact Person: Guido <br /> Van Meek, P.E., Project Manager (305) 477-7575 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-934 (NW 79 St.) from NW 6 Ave to JFK Causeway, Miami, Florida PROFESSIONAL SERViCES I CONSTRUCTION (If applicable) <br /> 2002 TBD <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cosl. etc.) AND SPECIFIC ROLE U Check if project performed with current firm <br />d. This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-of-Way <br /> mapping, GPS control. Mr. Diaz was the Survey Project Manager responsible for the direction of survey activities. <br /> Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271 <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> SR-5 (US-1) from SW 304 St. to SW 264 St., Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2001 2006 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. elc.) AND SPECIFIC ROLE TI Check if project performed with current firm <br />This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-of-Way <br /> mapping, GPS control. Mr. Diaz was the Survey Project Manager responsible for the direction of survey activities. <br /> Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271 <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />