|
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />o
<br />
<br />-
<br />
<br />12. NAME
<br />Pete Diaz, PSM
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Surveying Manager a. TOTAL
<br />20
<br />
<br />14. YEARS EXPERIENCE
<br />I b. WITH C~RRENT FIRM
<br />
<br />15. FIRM NAME AND LOCATION (City and Stale)
<br />Marlin Engineering, Inc., Miami, Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIAlIlA nON)
<br />Degree Studies, Miami-Dade Community College
<br />Miami, Florida 1984
<br />Member: Phi Theta Kappa Society
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida, Professional Surveyor and Mapper,
<br />Registration # 6052
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, elc.)
<br />N/A
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Sunny Isles Blvd. (SR-826) from Intracoastal Waterway Bridge to PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> Collins Ave, Sunny Isles, Florida 2005 N/A
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~J Check if project performed with current firm
<br />This project entailed the collection of Topographic data with specific attention to drainage structures, establish a control
<br /> network, Right of Way location. Mr. Diaz was the Survey Project Manager responsible for the direction of all survey
<br /> activities. Contact Person: George Fischer, Project Manager & Grant Coordinator (305) 947-0606
<br /> (1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
<br /> NW 25 St from NW 87 Ave to NW 67 Ave, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2005 TBD
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE - ~ Check jf project performed with current firm
<br />b. This project entailed the collection of Topography, DTM, Vertical control verification, reestablish points from control
<br /> network, LayouULocate bore holes and relate to existing Baseline. Mr. Diaz was the Survey Project Manager responsible
<br /> for the direction of all survey activities. Contact Person: Project Manager: Miguel Soria, P.E. (305) 477-7575
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Numerous sites throughout the City of Miami, Miami, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> 2005 2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ID Check if project performed with current firm
<br />c. This project entailed the collection of Topography, Vertical control verification, recover/reset City monuments as needed.
<br /> Mr. Diaz was the Survey Project Manager responsible for the direction of all survey activities. Contact Person: Guido
<br /> Van Meek, P.E., Project Manager (305) 477-7575
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR-934 (NW 79 St.) from NW 6 Ave to JFK Causeway, Miami, Florida PROFESSIONAL SERViCES I CONSTRUCTION (If applicable)
<br /> 2002 TBD
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cosl. etc.) AND SPECIFIC ROLE U Check if project performed with current firm
<br />d. This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-of-Way
<br /> mapping, GPS control. Mr. Diaz was the Survey Project Manager responsible for the direction of survey activities.
<br /> Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271
<br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
<br /> SR-5 (US-1) from SW 304 St. to SW 264 St., Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2001 2006
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. elc.) AND SPECIFIC ROLE TI Check if project performed with current firm
<br />This project entailed the acquisition of raster imagery, DTM, Topography, Project Network Control, Right-of-Way
<br /> mapping, GPS control. Mr. Diaz was the Survey Project Manager responsible for the direction of survey activities.
<br /> Contact Person: Harold Desdunes, P.E., Project Manager, (305) 470-5271
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|