My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Russell Partnership, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
The Russell Partnership, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2011 3:36:31 PM
Creation date
8/29/2008 12:57:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />. QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />. Complete one Section F for each Droiect. ) <br />. 21. TITLE AND LOCATION (City and State) <br />Tamiami Park - 3 separate projects <br />. Miami, FL <br />. <br /> <br />. a. PROJECT OWNER <br />. Miami Dade County Parks and <br />. Recreation Department <br /> <br />. 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />. Restrooms, Shelters 8r. North Boundary Fence <br /> <br />. Architectural and Engineering Services for of a new restroom building of approximately 811 adjusted square <br /> <br />. feet, walks, utility connections, landscaping and ancillary facilities. Facility will be a one story restroom <br /> <br />. building with Janitor's Closet. Construction of 5 new picnic shelters with associated landscaping, utilities, <br /> <br />. walks, and related improvements and construction of a new north boundary fence and related improvements. <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />6 <br /> <br />22. YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES <br />2003-present <br /> <br />CONSTRUCTION (If applicable) <br /> <br />NA <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />b. POINT OF CONTACT NAME <br />Adelfa Martinez <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />(305) 755-7815 <br /> <br />. <br /> <br />. New Soccer Fields and Irrigation <br />. The project is comprised of Design and Construction of new soccer fields with lighting and irrigation, walks, <br />. utility connections, landscaping, parking wi drainage, lighting and water and ancillary facilities. <br />. <br />. Parking Lot, Walkways 8r. Lighting <br />. The project is comprised of Design and Construction of one (1) lighted parking lot consisting of a total of 266 <br />. parking spaces including 8 accessible parking spaces, two 2 stroller spaces with pathways, sports lighting and <br />. retractable bollards. <br />. <br />. <br />. <br />. <br />o <br />o <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />.a. The Russell Partnership, Inc. Miami, FL Architect <br />- <br />- (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Cb. Brill Rodriguez Salas Miami, FL Structural Engineer <br />- <br />W' (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />~c. <br /> <br />. <br />. <br />Q <br />. <br />n <br /> <br />STANDARD FORM 330 (6/2004) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.