My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2000-93
SIBFL
>
City Clerk
>
Ordinances
>
2000
>
Ordinance 2000-93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 10:36:01 AM
Creation date
1/25/2006 4:40:55 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2000-93
Date (mm/dd/yyyy)
05/18/2000
Description
Ord. 99-74: Revise Fee Schedule, Including Costs, for Zoning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />~ <br /> <br />~ <br /> <br />W29 <br />~ <br /> <br />ffi3+ <br />~ <br /> <br />iffi33 <br />~ <br /> <br />a35 <br />lR36 <br /> <br />~ <br /> <br />~ <br /> <br />on the premises so used per 100 sq. ft. or fractional part of floor area. <br />Mobile Homes additions - each 100 sq. ft. or fractional part of floor area. <br /> <br />Tents <br />o - 5000 sq. ft. <br />over 5000 sq. ft. <br /> <br />All others per 100 sq. ft. or fractional part of floor area. <br /> <br />5. FOR STRUCTURES OF UNUSUAL SIZE OR NATURE AS ARENAS, STADIUMS <br />AND WATER AND SEWER PLANTS llIE FEE SHALL BASED ON 1120F 1 % OF <br />THE ESTIMATED CONSTRUCTION <br /> <br />6. NEW CONSTRUCTION OTHER OllIER llIAN AS SPECIFIED HEREIN:(WATER <br />TOWERS, PYLONS, BULK STORAGE-T ANI< FOUNDATIONS, UNUSUAL LIMITED <br />USE BUILDINGS, MARQUEES, AND SIMILAR CONSTRUCTION) <br /> <br />For each $1..000 of estimated cost or fractional part <br /> <br />7 AL TERA TIONS AND REPAIRS TO BUILDING AND OTHER STRUCTURES <br />(EXCEPT GROUP 1) <br /> <br />For each $100 of estimated cost or fractional part <br /> <br />Minimum Fee <br /> <br />8 MOVING BUILDINGS FOR OTHER STRUCTIJRES <br /> <br />For each 100 sq. ft. or fractional part thereof (does not include cost of <br />new foundation or repairs to buildings or structure) <br /> <br />9. FENCES AND/OR WALLS <br /> <br />Chainlink <br />o - 500 linear ft. <br />501 - 1000 linear ft. <br />each additional linear ft. over 1000 <br />Wood each linear ft. <br />Concrete each linear ft. <br /> <br />10. SWIMMING POOLS, SPAS, AND HOT TIJBS <br /> <br />Installation of Swimming PooVSpa <br />Repair of Swinuning PooVSpa <br /> <br />1.46 <br /> <br />11.00 <br /> <br />2.20 <br /> <br />1.80 <br /> <br />0.26 <br /> <br />42.00 <br /> <br />2.00 <br /> <br />13.00 <br />17.00 <br />0.01 <br />0.14 <br />0.24 <br /> <br />25.00 <br />13.00 <br /> <br />II. TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY <br /> <br />For each 100 sq. fl. or fractional part of platform area <br />For each 100 linear feet or fractional part of seats <br /> <br />12. SCREEN ENCLOSURES, CANOPIES & AWNINGS <br /> <br />(a) Screen enclosures <br />Each 100 sq. ft. or fraction thereof <br />(b) Free standing canopies <br />For each $ 1,000 of estimated cost or fractional part <br />Minimum Fee <br /> <br />1.10 <br />0.90 <br /> <br />1.85 <br /> <br />1.70 <br />13.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.