Laserfiche WebLink
<br />""" <br /> <br />- <br /> <br />2000 2015 <br /> <br />- <br /> <br />- <br /> <br />a) <br /> <br />The regional treatment system shall operate with a rated <br />maximum daily capacity that is no less than i-percent above the <br />maximum daily flow for the preceding year, and an average <br />daily capacity 2-percent above the average daily per capita <br />system demand for the preceding 5 years. <br /> <br />- <br /> <br />- <br /> <br />... <br /> <br />b) Water shall be delivered to users at a pressure no less than 20 <br />pounds per square inch (psi) and no greater than 100 psi. <br />Unless otherwise approved by the Miami-Dade Fire <br />Department, minimum fire flows based on the land use served <br />shall be maintained as follows: <br /> <br />.. <br /> <br />!!III <br /> <br />.. <br /> <br />.. <br /> <br />- <br /> <br />Land Use <br /> <br />Min. Fire Flow (GalIMin) <br /> <br />.. <br /> <br />- <br /> <br />Singe Family ResidentialjEstate <br />Single Family and Duplex; with <br />residential on minimum lots of 7,500 sf. <br />Multi-Family Residential: <br />Semiprofessional Offices <br />Hospitals; Schools <br />Business <br /> <br />500 <br /> <br />- <br /> <br />750 <br /> <br />- <br /> <br />.. <br /> <br />1,500 <br />2,000 <br />3,000 <br /> <br />- <br /> <br />c) <br /> <br />Water quality shall meet all federal, State and County primary <br />standards for potable water. <br /> <br />!!III <br /> <br />.. <br /> <br />2) Sanitary Sewer: <br /> <br />- <br /> <br />.. <br /> <br />a) <br /> <br />Regional wastewater treatment plants shall operate with a <br />physical capacity of no less than the annual average daily <br />sewage flow. <br /> <br />!IIIII <br /> <br />- <br /> <br />.. <br /> <br />b) Effluent discharged from wastewater treatment plants shall <br />meet all federal, State and County standards. <br /> <br />- <br /> <br />c) The system shall maintain the capacity to collect and dispose of <br />102-percent of the average daily per capita sewage system <br />demand for the preceding five years. <br /> <br />- <br />.. <br /> <br />'I! <br />\'h <br />. <br /> <br />2B. Except as provided by Objective 1 and the supporting policies, no <br />development order authorizing new development or a significant <br />expansion of an existing use shall be issued for any area of the City which <br />is served by a potable water or sanitary sewer facility which does not meet <br />the standards in Policy 2A or will not meet these standards concurrent <br />with the completion of the development. In any case where the federal, <br />State, or County standards referenced in Policy 2A are revised, a <br />reasonable time for compliance with the new standards shall be allowed. <br /> <br />" <br />.. <br /> <br />" <br />II <br /> <br />I.,.... <br />...~. . ~ <br /> <br />I <br />II <br /> <br />City of Sunny Isles Beach Comprehensive Plan <br /> <br />63 <br />