My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2001-137
SIBFL
>
City Clerk
>
Ordinances
>
2001
>
Ordinance 2001-137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 10:36:06 AM
Creation date
1/25/2006 4:41:00 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2001-137
Date (mm/dd/yyyy)
09/13/2001
Description
Operating & Capital Outlay Budget FY 2001/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Debt Service Schedule - Stormwater Fund <br /> <br />Golden Shores Stormwater Proiect <br /> <br />State Revolving Loan Funding <br /> <br />04/01/02 Issue. 20 year <br /> <br />EST, ISSUE AMOUNT = 3,000,000 <br /> <br />PRINCIPLE <br /> <br />INTEREST <br /> <br />RATE(%) <br /> <br />TOTAL AMOUNT <br /> <br />3.16 <br /> <br />This project entails the fining and sealing of drain pipes throughout the Golden Shores neighborhood, improvements to the pump station operation, and setting the elevations of <br />the catch basins including wells along Atlantic Boulevard, and finally, regrading and paving of all roadways. We were sucessful in obtaining a State grant of $500,000 towards this <br />project, in addition to low interest financing through the State Revolving Fund, We are planning for this project to begin next summer, with bidding commencing by January 2002. <br /> <br />. <br />f""..- <br />.......:.1 <br /> <br /><- <br /> <br />Central Island Stormwater Proiect <br /> <br />State Revolving Loan Funding <br /> <br />Issue Date Undetermined. 20 year <br /> <br />EST, ISSUE AMOUNT = 3,500,000 <br /> <br />PRINCIPLE <br /> <br />INTEREST <br /> <br />RATE(%) <br /> <br />TOTAL AMOUNT <br /> <br />3,16 <br /> <br />This project includes the installation of storm drain lines, a pump station, and injector wells throughout the area on the west side of Conins Avenue, north of 174th Street to 183rd <br />Street. The pump station has been proposed for the southern end of the Passive Park, with injector wells along the sides of the park extending in a northemly direction. However, <br />we are considering moving the pump station further south, off the park property, due to the potential disruption to the park by the construction, This will be evaluated into the 2001. <br />2002 fiscal year, <br /> <br />;.?' <br /> <br />i{ <br /> <br />EO <br />
The URL can be used to link to this page
Your browser does not support the video tag.