Laserfiche WebLink
<br />Debt Service Schedule - Stormwater Fund <br /> <br />Golden Shores Stormwater Proiect <br /> <br />State Revolving Loan Funding <br /> <br />04/01/02 Issue. 20 year <br /> <br />EST, ISSUE AMOUNT = 3,000,000 <br /> <br />PRINCIPLE <br /> <br />INTEREST <br /> <br />RATE(%) <br /> <br />TOTAL AMOUNT <br /> <br />3.16 <br /> <br />This project entails the fining and sealing of drain pipes throughout the Golden Shores neighborhood, improvements to the pump station operation, and setting the elevations of <br />the catch basins including wells along Atlantic Boulevard, and finally, regrading and paving of all roadways. We were sucessful in obtaining a State grant of $500,000 towards this <br />project, in addition to low interest financing through the State Revolving Fund, We are planning for this project to begin next summer, with bidding commencing by January 2002. <br /> <br />. <br />f""..- <br />.......:.1 <br /> <br /><- <br /> <br />Central Island Stormwater Proiect <br /> <br />State Revolving Loan Funding <br /> <br />Issue Date Undetermined. 20 year <br /> <br />EST, ISSUE AMOUNT = 3,500,000 <br /> <br />PRINCIPLE <br /> <br />INTEREST <br /> <br />RATE(%) <br /> <br />TOTAL AMOUNT <br /> <br />3,16 <br /> <br />This project includes the installation of storm drain lines, a pump station, and injector wells throughout the area on the west side of Conins Avenue, north of 174th Street to 183rd <br />Street. The pump station has been proposed for the southern end of the Passive Park, with injector wells along the sides of the park extending in a northemly direction. However, <br />we are considering moving the pump station further south, off the park property, due to the potential disruption to the park by the construction, This will be evaluated into the 2001. <br />2002 fiscal year, <br /> <br />;.?' <br /> <br />i{ <br /> <br />EO <br />