Laserfiche WebLink
<br />(c) Certificate from a registered professional engineer or architect that any non- <br />residential flood-proofed structure will meet the flood-proofing criteria in <br />Article 5, Section B(2) and Section D(2). <br /> <br />(d) Description of the extent to which any watercourse will be altered or <br />relocated as a result of a proposed development. <br /> <br />(2) Construction Stage: <br /> <br />(a) <br /> <br />Section C. <br /> <br />Provide a reg1:1latory floor elevation or flood-proofing certification after the <br />lowest floor is completed, UpOR plaeemeBt ofthe lowest floor, or instances <br />where the stmetare building is subject to the regulations applicable to <br />Coastal High Hazard Areas, after placement of the horizontal structural <br />members of the lowest floor, .:.... or for FlOB residem:ial stmemres, flood <br />proofiBg, Upon placement of the lowest floor. or flood-proofing by whatever <br />construction means. or uoon placement ofthe horizontal structural members <br />ofthe lowest floor. whichever is applicable, it shall be the duty of the permit <br />holder to submit to the Building Official ~ certification of the elevation of <br />the lowest floor, or flood-proofed elevation, or the elevation of the lowest <br />portion ofthe horizontal structural members ofthe lowest floor, whichever <br />is applicable, as built in relation to mean sea level. Said certification shall <br />be prepared by or under the direct supervision of a registered land surveyor <br />or professional engineer and certified by same. When flood proofing is <br />utilized for a particular building, said certification shall be prepared by or <br />under the direct supervision of a professional engineer or architect and <br />certified by same. Any work undertaken prior to submission of the <br />certification shall be at the permit holder's risk. <br /> <br />(b) <br /> <br />The Building Official shall review the referenced floor elevation survey data <br />submitted. Deficiencies detected by such review shall be corrected by the <br />permit holder immediately and prior to further progressive work being <br />permitted to proceed. Failure to submit the surveyor failure to make said <br />corrections required hereby, shall be cause to issue a stop-work order for the <br />project. <br /> <br />DUTIES AND RESPONSffiILITIES OF THE ADMINISTRATOR. <br /> <br />Duties of the Building Official shall include, but shall not be limited to: <br /> <br />(1) Review all development permits to assure that the permit requirements of this Ordinance <br />have been satisfied. <br /> <br />(2) Advise permittee that additional Federal or State permits may be required, and if specific <br />Federal or State permit requirements are known, require that copies of such permits be <br />provided and maintained on file with the development permit. <br /> <br />Emergency Flood Damage Prevention Ord. <br />Legislation/Ordinances/Attorney <br />10/2/01 --3:46 PM <br /> <br />11 <br />