Laserfiche WebLink
<br />BUILDING DEPARTMENT <br /> <br />26. PILING <br />Dolphin pile, each <br /> <br />27. SEA W ALLSIRETAINING WALLS <br />50 feet and under <br />Over 50 feet, per foot <br /> <br />28. TENTS (temporary, carnivals, etc.) <br />30-day maximum <br /> <br />29. LANDSCAPING <br />When application for a landscaping and tree removal permit is <br />approved and before a permit is issued, a fee therefore shall be paid <br />based on the following schedule of rates. Other fees, as referenced <br />throughout this division, are also applicable before, during, and <br />after permit issuance. <br />1. Minimum fee <br />2. General landscaping, per sq. ft. of required landscaping <br />3. Residences (new) <br />Single - family <br />Duplex <br />4. Landscaping for code compliance <br />5. Tree removal, per tree <br /> <br />C. PLUMBING PERMIT FEES <br /> <br />1. MINIMUM PLUMBING OR GAS FEE PER PERMIT <br /> <br />Except as otherwise specified <br />(This minimum does not apply to supplemental plumbing permits issued as <br />supplementary to current outstanding permits for the same job.) <br /> <br /> <br />FEE SCHEDULE <br /> <br />14.00 <br /> <br />110.00 <br />1.50 <br /> <br />60.00 <br /> <br />100.00 <br />0.0175 <br /> <br />100.00 <br />100.00 <br />138.67 <br />16.12 <br /> <br />$ 75.00 <br /> <br />- <br /> <br />PAGE 12 OF 29 <br />