Laserfiche WebLink
<br />Building Department Fee Schedule <br /> <br />4. NEW CONSTRUCTION COMMERCIAL I MULTI <br />- FAMILY RESIDENTIAL <br /> <br />All structures per 100 sq. ft. or fractional part of floor $ 18.23 <br />area. $ 21.00 <br /> <br />B-015 <br /> <br /> <br />B-017 <br /> <br />For structures of unusual size or nature such as arena, <br />stadiums and water sewer plants the fee shall be based <br />on 1/2 of 1 % of the estimated construction cost. <br /> <br />5. NEW CONSTRUCTION OTHER THAN AS <br />SPECIFIED HEREIN <br /> <br />Bulk storage - tank foundations, unusual limited - use <br />buildings, marquees, and similar construction. <br /> <br />B-018 <br /> <br />For each $1000.00 of estimated cost or fractional part $ 9.50 <br /> <br />6. ALTERATIONS AND REPAIRS TO BUILDINGS <br />AND OTHER STRUCTURES (EXCEPT GROUP R) <br /> <br />B-019 <br /> <br />For each $100.00 of estimated cost or fractional part. <br /> <br />$ 2.50 <br /> <br />Minimum Fee <br /> <br /> <br />7. MOVING BUILDINGS OR OTHER STRUCTURES <br /> <br />B 028 <br /> <br />For each 100 sq, ft. or fractional part thereof (does not $ 15.00 <br />include cost of new foundation or repairs to building. <br />8. SLABS $ 100.00 <br />8. ROOFING (INCLUDING RE - ROOFING) <br />GROUP I R OCCUPANCY <br /> <br />B-020 <br /> <br />Building Department Fee Schedule - rev. 2/05 <br /> <br />Page 11 of 33 <br />