My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2005-228
SIBFL
>
City Clerk
>
Ordinances
>
2005
>
Ordinance 2005-228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 2:53:22 PM
Creation date
1/25/2006 4:41:12 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2005-228
Date (mm/dd/yyyy)
05/12/2005
Description
Amd Ord. 2004-196; Revised Fee Schedule for Bldg Dept.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F-006 <br /> <br />Building Department Fee Schedule <br /> <br />Failure to renew C/O, TCO or Temporary Certificate of $ 150.00 <br />Completion (TCe) C/Os, TCOs or TCCs not renewed on <br />or before the renewal or expiration dates will be <br />assessed a violation fee plus a double C/O, TCO or TCC <br />fee. <br /> <br />2. CERTIFICATE OF COMPLETION (C.C.) <br /> <br />F-007 <br /> <br />F-008 <br /> <br />Single Family residence, townhouse, mobile home in $ 35.00 <br />mobile park unit and commercial shell per trade. <br />Duplexes per structure $ 40.00 <br /> <br />F 999 <br /> <br />When the TemporJry C/O (TCO) JpplicJtion is recei'Jed $ 25.00 <br />the JpplicJnt shJII pJ'y' In up front processing fee. This <br />processing fee is not refundJble. This fee shJII be <br />deducted from the totJI cost of the CO. <br /> <br />F-Ol0 <br /> <br />When an inspection is necessary prior to the issuance $ 32.00 <br />of a C/O or TCO or TCC and inspection fee shall be <br />charged for each inspector who is required to make a <br />field inspection. Temporary C/O and CC will be charged <br />a fee equal to the final CO or CC cost in addition to the <br />inspection fee. This fee will be required regardless of <br />the length of time the Temporary CO or CC is needed <br />up to ninety (90) days for Certificates of Use and <br />Occupancy and up to sixty (60) days for Temporary <br />Certificate of Completion. Temporary Certificates of <br />Completion or Occupancy are charged at a fee equal to <br />the Permanent Certificate of Completion or Occupancy. <br /> <br />5. CO, CC AND TCC RE-INSPECTION FEE <br /> <br />F-Oll <br /> <br />When extra inspection trips are necessary due to (1) $ 53.00 <br />wrong address being given on call for inspection to <br />require corrections not being made or completed at <br />time specified or use, a fee for each inspector who <br />must return shall be charged. <br /> <br />Building Department Fee Schedule - rev. 2/05 <br /> <br />Page 33 of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.