Laserfiche WebLink
<br />Building Department Fee Schedule <br /> <br />Except as otherwise specified this minimum does not <br />apply to supplemental Electrical permits issued as <br />supplementary to current outstanding permits for the <br />same job and demolition work). <br /> <br />EL':b'b'1.a <br /> <br /> <br />2;5% <br /> <br />la. ONE - ITEM LOW COST PERMIT FEE <br /> <br />EL-002 A permit fee for a one - item permits with a cost of $ 35.00 <br /> $1000 or less. <br />EL-003 2. RESIDENTIAL I COMMERCIAL (CONDO, NEW <br /> CONSTRUCTION) <br /> All electrical within unit per square feet, except all $9.12 <br /> common areas. $0.15 <br />EL-004 3. RESIDENTIAL: (Remodeling, condo, house, new $0.12 <br /> house) per square feet, not including service or special $CM9 <br /> systems. <br />EL-005 4. AC: HEAT $26.50 <br /> <br />5. AC: COOL <br /> <br />Maximum Fee <br /> <br />$9.00 <br />$3.70 <br /> <br />$ 2.25 <br /> <br />$ 175.00 <br /> <br />EL-006 <br />EL':006;a <br /> <br />EL~006.b <br /> <br />l!L':006ic <br /> <br />First Ton <br />Two Tons to Ten Tons (per ton) <br /> <br />Ten Tons or Greater (per ton) <br /> <br />6. MOTORS: PER HORSE POWER <br /> <br />EL-007 One horse power or less <br /> <br />l!"~001.a Two horse power to ten horse power (per Horse <br />Power) <br />E"'~b'b1.b Ten horse power or more (per Horse Power) <br /> <br />$9.00 <br />$3.70 <br />$ 2.25 <br /> <br />Building Department Fee Schedule - rev. 11/6 <br /> <br />Page 21 of 34 <br />