My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2006-268
SIBFL
>
City Clerk
>
Ordinances
>
2006
>
Ordinance 2006-268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2010 10:36:20 AM
Creation date
12/26/2006 1:10:12 PM
Metadata
Fields
Template:
CityClerk-Ordinances
Ordinance Number
2006-268
Date (mm/dd/yyyy)
12/14/2006
Description
Amd. Ch.156 Code - Revised Fee Schedule (Bldg. Dept)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Building Department Fee Schedule <br /> <br />MC-035 <br /> <br />Per ride <br /> <br />$ 95.00 <br />$ 75.00 <br /> <br />MC-036 <br /> <br />For each permanent unit installed or altered <br /> <br />MC-037 <br /> <br />Annual inspection for each ride or device at anyone $ 75.00 <br />location (permanent installation only) <br /> <br />14. BOILERS AND PRESSURE VESSELS <br /> <br />Installation permits fees (including initial inspections <br />and certificate). Does not include installation or <br />connection of fuel and water lines. <br /> <br />The following fees apply to each boiler to be installed <br /> <br />MC-038 <br /> <br />Boilers less than 837 MBTU - each <br /> <br />$ 8&.87 <br />$86;00 <br /> <br />$ 193.9& <br />$10:3.00 <br /> <br />MC-039 <br /> <br />Boilers 837 MBTU to 6,695 MBTU - each <br /> <br />MC-040 <br /> <br />Boilers 6,695 MBTU and up - each <br /> <br />$ 113.12 <br />$t43;00 <br />$ &8.79 <br />$CSgiOO <br />$ &8.79 <br />$CS9iOO <br /> <br />MC-041 <br /> <br />Steam driven prime movers - each <br /> <br />MC-042 <br /> <br />Steam actuated machinery - each <br /> <br />MC-043 <br /> <br />Unfired pressure vessels (operating at pressures in <br />excess of 60 PSI and having volume of more than 5 cu. <br />ft.) each pressure vessel. <br /> <br />$ 8&.87 <br />$$6iOO <br /> <br />15. FEES FOR PERIODIC RE-INSPECTIONS <br /> <br />MC-044 <br /> <br />Steam boilers (annual) - each <br /> <br />$ lU.12 <br />$t43iOO <br />$ &9.&~ <br />$CSO.OO <br /> <br />MC-045 <br /> <br />Hot water boilers (annual) - each <br /> <br />Building Department Fee Schedule - rev. 11/6 <br /> <br />Page 29 of 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.