• <br /> TASK 2-Meetings/Coordination with FP&L and Utilities <br /> Subtask 2.1 -Through series of meetings, five (5) anticipated, CONSULTANT to introduce project to <br /> • FP&L and identify project as defined by CLIENT. The purpose of meetings will be to determine project <br /> details, including existing and proposed utility locations, service connections, easements, service <br /> •requirements, timelines, phasing, limitations, tariff, responsibilities (FP&L, CiTY, and CONSULTANT), <br /> preliminary costs,and other information needed to move the projects forward. <br /> • ' Subtask 2.2 - Subsequent to meeting with FP&L, CONSULTANT to meet with other utilities to <br /> introduce project and identify project details, including existing and proposed utility locations, service <br /> • connections, easements, service requirements, timelines, phasing, limitations, permit procedures, <br /> preliminary costs, pole/line agreements, relocation and other information needed to move the projects <br /> forward. CONSULTANT assumes Up to thtee (3) meetings to address phone, cable, water and <br /> sanitary issues. <br /> Subtask 2.3 - Subsequent to meeting with FP&L, CONSULTANT shall meet with FOOT to introduce <br /> project and identity requirements and restrictions as well as existing infrastructure. In addition, • <br /> CONSULTANT shall discuss requirements to combine project with the FDOTs planned RRR project <br /> Discussions shall be incorporated into design considerations and discussion with utilities. <br /> Subtask 2.4 - In providing the above services, CONSULTANT shall attend periodic meetings with <br /> CLIENT to provide review and update of findings. The frequency of meetings will be as determined by <br /> CLIENTland predicated by progress and issues that arise. Services for this task to be billed on.a T&M <br /> basis with approval from CLIENT. For the Purpose of this proposal; CONSULTANT estimate of effort <br /> assumes an average of 3 hours per week over a period of 12 weeks to be spent on meetings and <br /> coordination with CL DENT. <br /> Subtask.25 - Separate but related to undergrounding of utilities, CONSULTANT shall explore issue <br /> of lighting problems currently experienced within Collins Avenue. Previous correspondence between <br /> City Staff, County, FP&L, and FOOT suggest the fixtures•have outlived their design life resulting in <br /> increased maintenance.and outages. Ownership of the fixtures belongs with FDOT District VI. A more <br /> concliuive assessment of the system is required to identity deficiencies by type and severity. This task • <br /> is to provide an elementary assessment of conditions from field observations and readily avaitabfe <br /> information with the intent of suggesting improvements to be incorporated into undergrbuhdiing design. <br /> Servicss for this task to be billed on a T&M basis with approval from CLIENT. For the purpose of this <br /> proposal, CONSULTANT estimate of effort assumes tip to 10 hours be spent on meetings and <br /> coordination. <br /> • <br /> • ProiessionalServices Agteement <br /> Project Name: Utility Underorounding Consulting <br /> Project Location:Sunny isles Beach,FL <br /> _1 KEITH and SCFENARS, P.A. K&S Proposal No.:P8098.MK • <br /> ®_ ENGINEERS,PLANNERS, SURVEYORS Revu=d=ebruary 5,2013 Pea=5 <br /> • • ; <br />