Laserfiche WebLink
<br />:c~ <br /> <br />EAS ENGINEERING, INC. <br /> <br />55 ALMERIA AVE. . CORAL GABLES' FLORIDA ~3134 . (305) 415.5553 . FAX. (305) 444.2112 . WWW.EAS-ENG.COM <br /> <br />June 30, 2010 <br /> <br />Joel Wadsworth <br />Project Manager (Browarcl) <br />Calvin, Giordano & Associates, Inc. <br />1800 Eller Drive, Suite 600 <br />Ft Lauderdale, FI 33316 <br /> <br />Re: North Bay Road Bridge Project <br />City of Sunny Isles Beach <br /> <br />Dear Mr. Wadsworth: <br /> <br />EAS Engineering, Inc. is pleased to submit the following proposal for professional environmental and <br />engineering services related to the above referenced project. <br /> <br />It is our understanding that you require assistance in obtaining environmental permits for a new bridge <br />across an existing canal in Sunny Isles Beach, We have reviewed the information in the CD that YOll sent <br />to liS. Based upon our understanding of your requirements, we have prepared a scope of services which we <br />feel will be responsi ve to your needs. Our scope of services includes the following tasks: <br /> <br />TASK I <br />TASK 2 <br /> <br />ENV IRONMENT AL PERMITTING <br />MISCELLANEOUS GENERAL CONSULTING <br /> <br />TASK 1 - ENViRONMENTAL PERM1TTlNG <br /> <br />Each agency has identified missing items in the application forms that were submitted, including riparian <br />property owners who must verify DERM's application and a missing signature on the ERP application. <br />Also, in November, 2009, DERM began using a new Class I Application Form. EAS Engineering will <br />prepare, if necessary, new permit applications and sketches. Applications, including a Class I permit <br />application to Miami-Dade COllnty Department of EnvirolUllental Resource Management (DERM) and an <br />Environmental Resources Permit (ERP) application to the South Florida Water Management District <br />(SFWMD) and the Army Corps of Engineers (Corps), will be submitted to you for review and signature <br />prior to submittal to the respective agencies. <br /> <br />Obtaining the DERM and SFWMD permits will be a two-step process. The first step is conceptual <br />approval based on the permit sketches. The actual permit cannot be obtained until after detailed <br />construction plans are submitted for review (the second step in the process). It is assumed that the detailed <br />construction and drainage plans and calculations necessary for these permit applications will be prepared by <br />others. Those costs are not included in this proposal. <br />