Laserfiche WebLink
<br />EAS ENGINEERING, INC. <br /> <br />55 ALMERIA AVE. . CORAL GABLES. FLORIDA 33134 . (305) 445-5553. FAX: (305) 444-2112. WWW.EAS.ENG.COM <br /> <br />July 6, 010 <br /> <br />Mr. Joel Wadsworth <br />Project Manager (Broward) <br />Calvin, Giordano & Associates, Inc. <br />1800 Eller Drive, Suite 600 <br />Ft Lauderdale, FI33316 <br /> <br />Re: Newport Fishing Pier Project <br />City of Sunny Isles Beach <br /> <br />Dear Mr. Wadsworth: <br /> <br />EAS Engineering, Inc. is pleased to submit the following proposal for professional environmental and engineering <br />services related to the above referenced project. <br /> <br />It is our understanding that you require assistance in obtaining environmental permits for a new fishing pier to <br />replace the existing fishing pier in Sunny Isles Beach. We have reviewed the information in the CD that you sent to <br />us. Based upon our understanding of your requirements, we have prepared a scope of services which we feel will be <br />responsive to your needs. Our scope of services includes the following tasks: <br /> <br />TASK I ENVIRONMENTAL PERMITTING <br />TASK 2 MISCELLANEOUS GENERAL CONSULTING <br /> <br />TASK 1 - ENVIRONMENTAL PERMITTING <br /> <br />EAS will meet with you and City staff to review the current status of the applications. Items that have been <br />requested by the regulatory agencies and the parties responsible for providing that information will be identified at <br />this meeting. EAS Engineering will respond to the agencies' requests for additional information as soon as the <br />requested information is available. The primary agencies involved in this project are the US Army Corps of <br />Engineers (Corps), Florida Department of Environmental Protection (FDEP) and Miami-Dade County Department <br />of Environmental Resources Management (DERM). <br /> <br />Obtaining the DERM and FDEP permits will be a two-step process. The first step is conceptual approval based on <br />the permit sketches. The actual permit cannot be obtained until after detailed construction plans are submitted for <br />review (the second step in the process). It is assumed that the detailed construction and drainage plans and <br />calculations necessary for these permit applications will be prepared by others. Those costs are not included in this <br />proposal. <br /> <br />EAS Engineering, Inc. will continue to respond to requests for additional information from all of these agencies. <br />Time will be devoted to keeping track of agency findings on a regular basis. This monitoring will provide us with <br />early detection of agency concerns and will minimize misunderstandings. Each of the applications will be tracked <br />until a decision is reached. As with all permitting matters, no guarantee can be provided regarding success or failure <br /> <br />I . <br />