<br />3. if the defective Work has been rejected by <br />Owner, remove it from the Project and replace it with <br />Work that is not defective, and <br /> <br />4. satisfactorily correct or repair or remove and <br />replace any damage to other Work, to the work of others <br />or other land or areas resulting therefrom. <br /> <br />B. If Contractor does not promptly comply with <br />the terms of Owner's written instructions, or in an <br />emergency where delay would cause serious risk of loss <br />or damage, Owner may have the defective Work <br />corrected or repaired or may have the rejected Work re- <br />moved and replaced. All claims, costs, losses, and <br />damages (including but not limited to all fees and charges <br />of engineers, architects, attorneys, and other professionals <br />and all court or arbitration or other dispute resolution <br />costs) arising out of or relating to such correction or repair <br />or such removal and replacement (including but not <br />limited to all costs of repair or replacement of work of <br />others) will be paid by Contractor. <br /> <br />C. In special circumstances where a particular <br />item of equipment is placed in continuous service before <br />Substantial Completion of all the Work, the correction <br />period for that item may start to run from an earlier date if <br />so provided in the Specifications. <br /> <br />D. Where defective Work (and damage to other <br />Work resulting therefrom) has been corrected or removed <br />and replaced under this Paragraph 13.07, the correction <br />period hereunder with respect to such Work will be <br />extended for an additional period of one year after such <br />correction or removal and replacement has been <br />satisfactorily completed. <br /> <br />E. Contractor's obligations under this Paragraph <br />13.07 are in addition to any other obligation or warranty. <br />The provisions of this Paragraph 13.07 shall not be <br />construed as a substitute for or a waiver of the provisions <br />of any applicable statute of limitation or repose. <br /> <br />13.08 <br /> <br />Acceptance of Defective Work <br /> <br />- <br /> <br />Contract Price, reflecting the diminished value of Work <br />so accepted. If the parties are unable to agree as to the <br />amount thereof, Owner may make a Claim therefor as <br />provided in Paragraph 10.05. If the acceptance occurs <br />after such recommendation, an appropriate amount will be <br />paid by Contractor to Owner. <br /> <br />13.09 Owner May Correct Defective Work <br /> <br />A. If Contractor fails within a reasonable time <br />after written notice from Engineer to correct defective <br />Work or to remove and replace rejected Work as required <br />by Engineer in accordance with Paragraph 13.06.A, or if <br />Contractor fails to perform the Work in accordance with <br />the Contract Documents, or if Contractor fails to comply <br />with any other provision of the Contract Documents, <br />Owner may, after seven days written notice to Contractor, <br />correct or remedy any such deficiency. <br /> <br />B. In exercising the rights and remedies under <br />this Paragraph 13.09, Owner shall proceed expeditiously. <br />In connection with such corrective or remedial action, <br />Owner may exclude Contractor from all or part of the <br />Site, take possession of all or part of the Work and <br />suspend Contractor's services related thereto, take posses- <br />sion of Contractor's tools, appliances, construction <br />equipment and machinery at the Site, an-d incorporate ii1 <br />the Work all materials and equipment stored at the Site or <br />for which Owner has paid Contractor but which are stored <br />elsewhere. Contractor shall allow Owner, Owner's <br />representatives, agents and employees, Owner's other <br />contractors, and Engineer and Engineer's consultants <br />access to the Site to enable Owner to exercise the rights <br />and remedies under this Paragraph. <br /> <br />C. All claims, costs, losses, and damages <br />(including but not limited to all fees and charges of <br />engineers, architects, attorneys, and other professionals <br />and all court or arbitration or other dispute resolution <br />costs) incurred or sustained by Owner in exercising the <br />rights and remedies under this Paragraph 13.09 will be <br />charged against Contractor, and a Change Order will be <br />issued incorporating the necessary revisions in the <br />Contract Documents with respect to the Work; and Owner <br />shall be entitled to an appropriate decrease in the Contract <br />Price. If the parties are unable to agree as to the amount of <br />the adjustment, Owner may make a Claim therefor as <br />provided in Paragraph 10.05. Such claims, costs, losses <br />and damages will include but not be limited to all costs of <br />repair, or replacement of work of others destroyed or <br />damaged by correction, removal, or replacement of <br />Contractor's defective Work. <br /> <br />A. If, instead of requiring correction or removal <br />and replacement of defective Work, OWner (and, prior to <br />Engineer's recommendation of final payment, Engineer) <br />prefers to accept it, Owner may do so. Contractor shall <br />pay all claims, costs, losses, and damages (including but <br />not limited to all fees and charges of engineers, architects, <br />attorneys, and other professionals and all court or <br />arbitration or other dispute resolution costs) attributable to <br />Owner's evaluation of and determination to accept such <br />defective Work (such costs to be approved by Engineer as <br />to reasonableness) and the diminished value of the Work <br />to the extent not otherwise paid by Contractor pursuant to <br />this sentence. If any such acceptance occurs prior to <br />Engineer's recommendation of fmal payment, a Change <br />Order will be issued incorporating the necessary revisions <br />in the Contract Documents with respect to the Work, and <br />Owner shall be entitled to an appropriate decrease in the <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright lid 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 35 <br /> <br />D. Contractor shall not be allowed an extension <br />of the Contract Times because of any delay in the <br />performance of the Work attributable to the exercise by <br />Owner of Owner's rights and remedies under this <br />Paragraph 13.09. <br />