Laserfiche WebLink
<br />D. At the time of delivery of the tentative <br />certificate of Substantial Completion, Engineer will <br />deliver to Owner and Contractor a written recommen- <br />dation as to division of responsibilities pending fmal <br />payment between Owner and Contractor with respect to <br />security, operation, safety, and protection of the Work, <br />maintenance, heat, utilities, insurance, and warranties and <br />guarantees. Unless Owner and Contractor agree otherwise <br />in writing and so inform Engineer in writing prior to <br />Engineer's issuing the definitive certificate of Substantial <br />Completion, Engineer's aforesaid recommendation will <br />be binding on Owner and Contractor until final payment. <br /> <br />E. Owner shall have the right to exclude <br />Contractor from the Site after the date of Substantial <br />Completion subject to allowing Contractor reasonable <br />access to complete or correct items on the tentative list. <br /> <br />14.05 Partial Utilization <br /> <br />A. Prior to Substantial Completion of all the <br />Work, Owner may use or occupy any substantially <br />completed part of the Work which has specifically been <br />identified in the Contract Documents, or which Owner, <br />Engineer, and Contractor agree constitutes a separately <br />functioning and usable part" of the Work that can be used <br />by Owner for its intended purpose without significant <br />interference with Contractor's performance of the <br />remainder of the Work, subject to the following condi- <br />tions. <br /> <br />1. Owner at any time may request Contractor in <br />writing to permit Owner to use or occupy any such part of <br />the Work which Owner believes to be ready for its <br />intended use and substantially complete. If and when <br />Contractor agrees that such part of the Work is <br />substantially complete, Contractor will certify to Owner <br />and Engineer that such part of the Work is substantially <br />complete and request Engineer to issue a certificate of <br />Substantial Completion for that part of the Work. <br /> <br />2. Contractor at any time may notify Owner and <br />Engineer in writing that Contractor considers any such <br />part of the Work ready for its intended use and substan- <br />tially complete and request Engineer to issue a certificate <br />of Substantial Completion for that part of the Work. <br /> <br />3. Within a reasonable time after either such <br />request, Owner, Contractor, and Engineer shall make an <br />inspection of that part of the Work to determine its status <br />of completion. If Engineer does not consider that part of <br />the Work to be substantially coniplete, Engineer will <br />notify Owner and Contractor in writing giving the reasons <br />therefor. If Engineer considers that part of the Work to be <br />substantially complete, the provisions of Paragraph 14.04 <br />will apply with respect to certification of Substantial <br />Completion of that part of the Work and the division of <br />responsibility in respect thereof and access thereto. <br /> <br />4. No use or occupancy or separate operation of <br />part of the Work may occur prior to compliance with the <br />requirements of Paragraph 5.10 regarding property <br />insurance. <br /> <br />14.06 Final Inspection <br /> <br />A. Upon written notice from Contractor that the <br />entire Work or an agreed portion thereof is complete, <br />Engineer will promptly make a final inspection with <br />Owner and Contractor and will notify Contractor in <br />writing of all particulars in which this inspection reveals <br />that the Work is incomplete or defective. Contractor shall <br />immediately take such measures as are necessary to <br />complete such Work or remedy such deficiencies. <br /> <br />14.07 Final Payment <br /> <br />A. Application for Payment <br /> <br />1. After Contractor has, m the opinion of <br />Engineer, satisfactorily completed all corrections <br />identified during the fmal inspection and has delivered, in <br />accordance with the Contract Documents, all maintenance <br />and operating instructions, schedules, guarantees, bonds, <br />certificates or other evidence of insurance certificates of <br />inspec;tidn,Irtarked~up' record documents (as" provided in <br />Paragraph 6.12), and other documents, Contractor may <br />make application for final payment following the <br />procedure for progress payments. <br /> <br />2. The final Application for Payment shall be <br />accompanied (except as previously delivered) by: <br /> <br />a. all documentation called for in the Contract <br />Documents, including but not limited to the <br />evidence of insurance required by Paragraph <br />5.04.8. 7; <br /> <br />b. consent of the surety, ifany, to fmal payment; <br /> <br />c. a list of all Claims against Owner that <br />Contractor believes are unsettled; and <br /> <br />d. complete and legally effective releases or <br />waivers (satisfactory to Owner) of all Lien rights <br />arising out of or Liens filed in connection with <br />the Work. <br /> <br />3. In lieu of the releases or waivers of Liens <br />specified in Paragraph l4.07.A.2 and as approved by <br />Owner, Contractor may furnish receipts or releases in full <br />and an affidavit of Contractor that: (i) the releases and <br />receipts include all labor, services, material, and <br />equipment for which a Lien could be filed; and (ii) all <br />payrolls, material and equipment bills, and other <br />indebtedness connected with the Work for which Owner <br />or Owner's property might in anyway be responsible have <br />been paid or otherwise satisfied. If any Subcontractor or <br />Supplier fails to furnish such a release or receipt in full, <br />Contractor may furnish a bond or other collateral <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright@2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 38 <br />