Laserfiche WebLink
<br />of the Work, submit evidence satisfactory to OWNER that such bonds will be <br />furnished. " <br /> <br />In the first line of Paragraph 2.02. change the term "...ten..." to read: <br /> <br />"...six(6l...". <br /> <br />Delete Paragraph 2.03. and replace with the following: <br /> <br />"The date of commencement of the Work is the date established in a Notice <br />to Proceed." <br />Add the following to Paragraph 2.05.: <br /> <br />B. CONTRACTOR shall perform no portion of the Work at any time without <br />Contract Documents or, where specified, approved Shop Drawings for such <br />portion of the Work. <br />C. By executing the Contract, CONTRACTOR represents that he has visited <br />the site, familiarized himself with the local conditions under which the Work <br />is to be performed, and correlated his observations with the requirements of <br />the Contract Documents." <br /> <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br /> <br />Add the following to Paragraph 3.02.A.: <br /> <br />"3. Sections of Division One - General Requirements govern the execution <br />of all sections of the Specifications." <br /> <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND <br />PHYSICAL CONDITIONS; REFERENCE POINTS <br /> <br />In Paragraph 4.02.A., change the term "...Supplementary Conditions..." to read: <br /> <br />"...bidding requirements...". <br /> <br />In Paragraph 4.02.B., change the term "Supplementary Conditions..." to read: <br /> <br />" ... bidding requirements...". <br /> <br />ARTICLE 5 - BONDS AND INSURANCE <br /> <br />In the first line of Paragraph 5 .04., following the word". ..insurance...", insert the words: <br /> <br />"... with a company or companies licensed to do business in the State of <br />Florida,..." . <br /> <br />In the last line of Paragraph 5.04.A.6., following the word "...vehicle.", insert the words: <br /> <br />09/09 <br /> <br />00800-2 <br /> <br />03-4122.F <br />