My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2009-1495
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2009
>
Reso 2009-1495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2010 11:13:54 AM
Creation date
9/30/2010 11:12:10 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2009-1495
Date (mm/dd/yyyy)
10/29/2009
Description
Bid 09-09-01/Agmt w/Tenex: Median Closure/Collins Ave Streetscape Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ENGINEER - <br /> <br />James E. Spinks III, P.E., <br />P.E. No. 66775 <br />Calvin Giordano & Associates <br />1800 Eller Drive, Suite 600 <br />Fort Lauderdale, Florida 33316 <br />(954) 921-7781 <br /> <br />L1VS Associates <br />2121 Ponce de Leon Blvd., Suite 610 <br />Coral Gables Florida 33134 <br /> <br />10. The additional liability coverage for ENGINEER is not to be construed <br />as to requiring, in any way, that either OWNER or CONTRACTOR be <br />obligated to supply insurance protecting ENGINEER for its liability <br />emanating from professional errors or omissions. <br />11 In conformance with the requirements of Section 725.06, Florida <br />Statutes, the specific considerations for CONTRACTOR's promises <br />are: <br /> <br />a. One dollar ($1.00) in hand paid by OWNER, ENGINEER, and <br />ENGINEER's employees to CONTRACTOR, receipt whereof is hereby <br />acknowledged and the adequacy of which CONTRACTOR accepts as <br />completely fulfilling the obligations of OWNER, ENGINEER, and <br />ENGINEER's employees under the requirements of Section 725.06, <br />Florida Statutes, and; <br />b. The entry of OWNER and CONTRACTOR into the construction <br />contract because, but for CONTRACTOR's promises as contained in <br />the General Conditions, OWNER would not have entered into the <br />construction contract with CONTRACTOR." <br /> <br />Add the following after Paragraph 5.06.E: <br /> <br />"F. The form of policy for this coverage shall be Completed Value. <br /> <br />G. If, under the provisions of this insurance, there are mandatory <br />deductibles, or if OWNER elects to increase the mandatory deductibles or <br />purchase this insurance with voluntary deductible amounts, then OWNER <br />shall be responsible for payment of the full amount of the deductible in the <br />event of a paid claim." <br /> <br />Delete Paragraph 5.07 in its entirety. <br /> <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES <br /> <br />Add the following after Paragraph 6.05.F: <br /> <br />09/09 <br /> <br />00800-5 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.