My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2009-1495
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2009
>
Reso 2009-1495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2010 11:13:54 AM
Creation date
9/30/2010 11:12:10 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2009-1495
Date (mm/dd/yyyy)
10/29/2009
Description
Bid 09-09-01/Agmt w/Tenex: Median Closure/Collins Ave Streetscape Imp
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />09/09 <br /> <br />subsequent application thereafter. For each application for payment <br />(excluding Application No.1) the Contractor shall submit with the <br />application Partial Releases of Liens for all Notice to Owners that have <br />been received for the project by the Owner and Engineer". <br />5. With each Application for Payment, the Contractor shall submit <br />supporting records and other evidence, in a form and amount <br />acceptable to the City and the Engineer, to demonstrate the expenses <br />incurred and the Work performed. This shall include, but not be <br />limited to documentation related to the purchase of Owner-Provided <br />Material and the reduction in the Contract Sum as a result of such <br />expenditures. <br />6. Each application for Payment shall be based on the most recent <br />schedule of values submitted by Contractor in accordance with the <br />Contract Documents. The schedule of values shall allocate the entire <br />guaranteed maximum Contract Price among the various portions of <br />the Work, except that the Contractor's Fee shall be shown as a <br />separate item. The schedule of values shall be prepared in such form <br />and supported by such data to substantiate its accuracy as the <br />Engineer may require. This schedule, unless objected to by the <br />Engine_er, ,shall be used as a basis for reviewing the Contractor's <br />Applications for Payment. <br />7. Applications for payment shall show the percentage of completion of <br />each portion of the Work as of the end of the period covered by the <br />Application for Payment. The percentage of completion shall be the <br />lesser of: (1) the percentage of that portion of the Work which has <br />actually been completed; or (2) the percentage obtained by dividing <br />(a) the expense that has actually been incurred by the Contractor on <br />account of that portion of the Work for which the Contractor has <br />made or intends to make actual payment prior to the next Application <br />for Payment by (b) the share of the Contract Price allocated to that <br />portion of the Work in the schedule of values. <br />8. Subject to the provisions of the Contract Documents, the amount of <br />progress payments shall be computed as follows: <br />a) take that portion of the Contract Price properly allocable to the <br />computed Work as determined by multiplying the percentage <br />of completion of each portion of the Work in the schedule of <br />values. Pending final determination of the costs to the Owner <br />of changes in the Work, amounts not in dispute shall be <br />included in the Application for Payment along with Change <br />Order, Work Change Directive or Written Amendment <br />indicating the parties' agreement with all or part of such costs <br />for additional Work. <br />b) add the portion of the Contract Price properly allocable to <br />materials and equipment delivered and suitably stored at the <br />site for subsequent incorporation in the Work, or, if approved <br />in advance by Owner, suitably stored off-site at a location <br />agreed upon in writing. <br /> <br />00800-8 <br /> <br />03-4122.F <br />
The URL can be used to link to this page
Your browser does not support the video tag.