Laserfiche WebLink
<br />FABIO AN <br />Project Manager <br />Professional Ex <br />Mr. Angarita has <br />responsible for t <br />from beginning to <br />in charge of the <br />compared to data <br />the staff and sup <br />MDC-DERM Se <br />MDC Camillus H <br />MDC-WASD Co <br />SW 288th St. be <br />MDC-WASD Co <br />Main on NW 1th <br />City of Tamarac <br />MDC-WASD Wa <br />26th St. & 12th - <br />Petro Hvdro, Inc. <br />City of Miami Ro <br />MDC FEMA Drai <br />Basin <br />City of Coral Spr <br />City of Tamarac <br />Tamarac Lakes <br />Broward County <br />FDOT SR 915 D <br />FDOT Roadway <br />88th St. <br />Education <br />Colombian School <br />2001, Actualizatio <br />References <br />City of Sunny Isle <br />Bill Evans, Public <br />City of Miami, 444 <br />Felix Rodriguez, C <br />South Broward Dr <br />Leo Schwartzberg <br /> <br />GARITA <br /> <br />.- <br /> <br />~~t~G~~t~sr,~ <br /> <br />perience <br />over 8 years of experience in all phases of construction / project management. He is <br />he planning, organization, directions, control and evaluation of construction projects <br />end according to work schedule, contract conditions and planned budget. He is also <br />plan and preparation of schedules and stages to be followed, verifying progress <br />, directing the purchase of all construction materials and acquisition of grounds, hiring <br />ervising the work of subcontractors and subordinate employees. <br /> <br />Pro'ect Name <br />aboard Access Ditch Enclosure <br />ouse - Water Main Extension <br />ntract W-866 - 36" Water Main at <br />tween 152nd Ave. & 14th Ave. <br />ntract ER - 47862 - 12" Force <br />Street between 37th & 33rd Ave. <br />6" FM and connection to lift station <br />ter Main Extension on SW 24t - <br />129th Ave. <br /> <br /> <br />ings Reconstruction of NW 44th St. <br /> <br />- Water Main Replacement of <br />Blvd. March 2005 - Ma 2005 <br />1m rovements <br />raina e & Roadwa 1m . <br />Imp. at A1A between 75t St. & <br /> <br />Nature of Work <br />Draina e & Roadwa 1m . <br />Water Main <br /> <br />Water Main <br /> <br />Amount <br />$400,000 <br />$100,000 <br /> <br />$1,050,000 <br /> <br />Force Main <br />Force Main <br />Water Main <br /> <br />$750,000 <br />$150,000 <br />$900,000 <br /> <br />Nature of Work <br />Draina e & Roadwa 1m <br />Drainage & Roadway <br />Restoration <br />WM Replacement & Roadway <br />Reconstruction <br />WM Replacement, Roadway <br />Restoration & Resurfacin <br />Sewer & Roadwa Reconst. <br />Concrete, Millin & Resurfacin <br /> <br />Concrete, Milling & Resurfacing <br /> <br />Amount <br />$850,000 <br /> <br />$1,175,000 <br /> <br />$760,000 <br /> <br />$750,000 <br />$1,050,000 <br />$1,150,000 <br />$1,330,000 <br /> <br />of Engineering 1998, Bachelor of Science in Civil Engineer <br />n in Design of Aqueduct Systems <br /> <br />s Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />Works Director (786) 586-7533 <br /> <br />SW 2nd Avenue, Miami, Florida 33130 <br />ity Construction Manager (305) 216-9544 <br /> <br />ainage District, 6591 SW 60th Avenue, Southwest Ranches, Florida 33331 <br />, Director (954) 680-3337 <br /> <br />12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 <br />