My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2010-1620
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2010
>
Reso 2010-1620
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2011 3:55:37 PM
Creation date
11/4/2010 1:51:38 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2010-1620
Date (mm/dd/yyyy)
10/14/2010
Description
RFP 10-08-01, Agmt w/Southeastern Eng, Central Isle Emer. Outfalls Phase IV
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-- <br /> <br />ARTICLE 9. SCOPE OF WORK MODIFICATION PROCEDURES <br /> <br />9.1 OWNER INITIATED MODIFICATIONS <br /> <br />The City or its designee will issue a detailed description of proposed changes in the Work that <br />may require an adjustment(s) to the Contract Amount or Contract Time. If necessary, the <br />description will include supplemental or revised drawings and specifications. Subsequent to <br />notification of modifications in the Work by City or its designee, Contractor shall submit a <br />quotation estimating cost adjustments to the Contract Amount and/or the Contract Time <br />necessary to execute the change. Contractor shall include the following information when <br />responding: <br /> <br />. Include a list of quantities of products required or eliminated and unit costs, with total <br />amount of purchases and credits to be made. If requested, furnish survey data to <br />substantiate quantities. <br />. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />. Include costs of labor and supervision directly attributable to the change. <br />. Include an updated contractor's construction schedule that indicates the effect of the <br />change, including but not limited to, changes in activity duration, start and finish times, <br />and activity relationship. Use available total float, if any, before requesting an extension <br />of the Contract Time. <br /> <br />9.2 CONTRACTOR INITIATED MODIFICATIONS <br /> <br />If latent or unforeseen conditions require modifications in the contract, the Contractor may <br />propose changes by submitting a request for a change to the City or its designee. Contractor <br />shall use form AlA Document G709 for said modification requests. The following MUST be <br />submitted/included by Contractor: <br /> <br />. A statement outlining reasons for the change and the effect of the change on the Work. <br />Provide a complete description of the proposed change. Indicate the effect of the <br />proposed change on the Contract Amount and the Contract Time. <br />. A list of quantities of products required or eliminated and unit costs, with total amount of <br />purchases and credits to be made. If requested, furnish survey data to substantiate <br />quantities. <br />· Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />. Cost of labor and supervision directly attributable to the change, <br />· Updated contractor's Construction Schedule that indicates the effect of the change, <br />including, but not limited to, changes in activity duration, start to finish times, and <br />activity relationship. Use available total float before requesting an extension of the <br />Contract Time. <br />· Comply with any applicable product requirements if the proposed change requires <br />substitution of one product or system for product or system specified. <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.