Laserfiche WebLink
<br />.... <br /> <br />with the Work, and will not be responsible for the Contractor's failure to carry out the <br />Construction Work in accordance with the Agreement. <br /> <br />20.6 The City or its designee will have authority to reject Work that does not conform to <br />the Contract Documents requirements. Whenever, in his or her opinion, it is considered <br />necessary or advisable to ensure the proper implementation of the Contract Documents, the <br />City or its designee will have authority to require special inspections or testing of the <br />Construction Work, whether or not such Construction Work is fabricated, installed or completed. <br />Neither the City's and/or its designee's authority to act under this Article, nor any decision <br />made by himlher in good faith either to exercise or not to exercise such authority, shall give rise <br />to any duty or responsibility of the City or its designee to the Contractor, any Sub-Contractor, <br />supplier or any of their agents, employees, or any other person performing any of the Construction <br />Work. <br /> <br />20.7 The City or its designee will not be responsible for the acts or omissions of the <br />Contractor, or anyone employed or contracted directly or indirectly by the Contractor including <br />any Sub-Contractor, or any of their agents or employees, or any other persons performing any of <br />the Work. <br /> <br />ARTICLE 21. DEFECTIVE WORK <br /> <br />21.1 The City or its designee shall have the authority to reject or disapprove Work which is <br />found to be defective. If defective work is found, Contractor shall promptly either correct all <br />defective work or remove such defective Work and replace it with non-defective Work. <br />Contractor shall bear all direct and indirect costs of such removal or corrections including <br />cost of testing laboratories and personnel. <br /> <br />21.2 Should Contractor fail or refuse to remove or correct any defective Work or to make any <br />necessary repairs in accordance with the requirements of the Contract Documents within the <br />time indicated in writing by the City or its designee, the City shall have the authority to cause the <br />defective work to be removed or corrected, or make such repairs as may be necessary at <br />Contractor's expense. Any expense incurred by the City in making such removals, corrections or <br />repairs, shall be paid for out of any monies due or which may become due to Contractor, or may <br />be charged against the Payment and Performance Bond. In the event of failure of Contractor to <br />make all necessary repairs promptly and fully, which is not cured in the Cure Period, the City may <br />declare Contractor in default. <br /> <br />21.3 If, within one (1) year after the date of Substantial Completion or such longer period of <br />time as may be prescribed by the terms of any applicable special warranty required by the <br />Contract Documents, or by any specific provision(s) of the Contract Documents, any of the <br />Construction Work is found to be defective or not in accordance with the Contract Documents, <br />Contractor, after receipt of written notice from the City or its designee, shall promptly correct such <br />defective or nonconforming Construction Work within the time specified by the City without cost to <br />the City. Nothing contained herein shall be construed to establish a period of limitation with <br />respect to any other obligation which Contractor might have under the Contract Documents <br />including but not limited to any claim regarding latent defects. <br /> <br />32 <br />