Laserfiche WebLink
<br />FABIO ANGARITA <br />Project Manager <br /> <br />- <br /> <br /><<9.~EtR~G~~!o~Sr,~ <br /> <br />Professional Experience <br />Mr. Angarita has over 8 years of experience in all phases of construction / project management. He is <br />responsible for the planning, organization, directions, control and evaluation of construction projects <br />from beginning to end according to work schedule, contract conditions and planned budget. He is also <br />in charge of the plan and preparation of schedules and stages to be followed, verifying progress <br />compared to data, directing the purchase of all construction materials and acquisition of grounds, hiring <br />the staff and supervising the work of subcontractors and subordinate employees. <br /> <br />Pro'ect Name <br />MDC-DERM Seaboard Access Ditch Enclosure <br />MDC Camillus House - Water Main Extension <br />MDC-WASD Contract W-866 - 36" Water Main at <br />SW 288th St. between 152nd Ave, & 14th Ave. <br />MDC-WASD Contract ER - 47862 -12" Force <br />Main on NW 1 th Street between 37th & 33rd Ave. <br />Cit of Tamarac 6" FM and connection to lift station <br />MDC-WASD Water Main Extension on SW 241 - <br />26th St. & 12th - 129th Ave. <br /> <br /> <br />City of Coral Springs Reconstruction of NW 44th St. <br /> <br />City of Tamarac - Water Main Replacement of <br />Tamarac Lakes Blvd. March 2005 - Ma 2005 <br />Broward Co un 1m rovements <br />FDOT SR 915 Draina e & Roadwa 1m . <br />FDOT Roadway Imp. at A1A between 751n St. & <br />88th St. <br /> <br />Nature of Work <br />Draina e & Roadwa 1m . <br />Water Main <br /> <br />Water Main <br /> <br />Amount <br />$400,000 <br />$100,000 <br /> <br />$1,050,000 <br /> <br />Force Main <br />Force Main <br />Water Main <br /> <br />. $750,000 <br />$150,000 <br />$900,000 <br /> <br />Nature of Work <br />Draina e & Roadwa 1m <br />Drainage & Roadway <br />Restoration <br />WM Replacement & Roadway <br />Reconstruction <br />WM Replacement, Roadway <br />Restoration & Resurfacin <br />Sewer & Roadwa Reconst. <br />Concrete, Millin & Resurfacin <br /> <br />Concrete, Milling & Resurfacing <br /> <br />Amount <br />$850,000 <br /> <br />$1,175,000 <br /> <br />$760,000 <br /> <br />$750,000 <br />$1,050,000 <br />$1,150,000 <br />$1,330,000 <br /> <br />Education <br />Colombian School of Engineering 1998, Bachelor of Science in Civil Engineer <br />2001, Actualization in Design of Aqueduct Systems <br /> <br />References <br />City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br />Bill Evans, Public Works Director (786) 586-7533 <br /> <br />City of Miami, 444 SW 2nd Avenue, Miami, Florida 33130 <br />Felix Rodriguez, City Construction Manager (305) 216-9544 <br /> <br />South Broward Drainage District, 6591 SW 60th Avenue, Southwest Ranches, Florida 33331 <br />Leo Schwartzberg, Director (954) 680-3337 <br /> <br />12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 <br />