My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2612
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 3:12:18 PM
Creation date
11/22/2016 2:39:11 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2612
Date (mm/dd/yyyy)
10/20/2016
Description
CO #11, Fla. Engineering Dev. Corp, 174 St. Roadway Impr. Project-Upgrade Lights.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Engineering & Development Corp <br /> 12076 NW 98th Ave. �— <br /> Hialeah Gardens El.33018 yFLORIDA ENGINEERING <br /> Z.DEVELOPMENT,_ rCORP. <br /> Project: NE 174th Street Roadway Improvements gi «�°1 <br /> Location: NE 174th Street <br /> Date:9/15/16 <br /> Scope: <br /> • Existing conduit Street Light system consist of 480 V and 120V wires going thru the same pipe conduit. <br /> • New proposed system will separate the 480 V feeder from 120 volt feeder. <br /> Open trench Excavation, Restoration,Labor and Materials to install new conduits,wires and pull <br /> • boxes from STA 10+00 to 35+80 ending in Collins Avenue. <br /> • Drawing attached for refernce. <br /> Exclusions: <br /> • Permit Fees are NOT including in this change order <br /> AMD No. 13 NEW STREET LIGHT SYSTEM Conduits,feeders. <br /> No. I ttem I Qty I Unit I Unit Price I Total <br /> A General Conditions <br /> 1 Surveying(Horizontal,Vertical,As Builts) I 1 Is $ 1,850.00 I $ 1,850.00 <br /> 2 Testing I 1 Is $ 1,150.00 I $ 1,150.00 <br /> 3 Police20 day $ 432.00 I $ 432.00 <br /> 4 MOT20 day $ 355.00_ $ 355.00 <br /> .___ .. $ 3,50.120- <br /> B Labor to install all wiring and remove the Misting wires <br /> 5 'Wiring 120 V Labor 3500 ( If f $ 3..04-1-$. 10,640.00 <br /> 6 Wiring 480 V Labor5400 If I $ 3.04 $ 16,416.00 <br /> 7 Remove old cables labor _ 4750 If I $ _ 1.22 I $ 5,795.0(3 <br /> $ 32,851.00 <br /> B Contract Items:Materials and labor are Included. <br /> 8 .Trench,F&I(3-4)2'SCH 80,Gray Conduit 3500 If $ 17.84 I$ 62,440.00 <br /> •9 Pull Box,F&I,13°x24"x12°(On Lid:"Sunny Isles Beach") 42 ea $ 759.00 $ 31,878.00 <br /> $ 94,318.00 <br /> C Materials <br /> 10 'Fuse and fuse holders _ 57 ea $ 54.40 I $ 3,100.80 <br /> 11 Ground rods : 19 ea $ 20.40 $ 387.60 • <br /> 12 Weather proof Polaris 38 ea $ 36.72 I $ 1,395.36 <br /> 13 #6 wire Lighting 31000 If $ 0.73 I $ 22,568.00 <br /> 14 I#8 wire receptacles 31500 If $ 0.41I $ 12,852.00 <br /> 15I#10 wire receptacles 21100 If I $ 0.41 I $ 8,608.80 <br /> 16 Milscellaneous 1 Is $ 4,080.00 $ 4,080.00 <br /> $ 52,992.56 <br /> D Asphalt restoration to cross islands and NBR Intersection. <br /> 17 'Trench Asphalt Restoration between the islands and at NBR. _ 360 If I $ 9.00 I $ • 3,240.00 <br /> (open trench,limerock backfill and Asphalt restoration 1") $ 3,240.00 <br /> Sum $ 187,188.56 <br /> 1596 Overhead,profit $ 28,078.28 <br /> AMD 1113 Total $ 215,266.84 <br /> Omar Medina <br /> Florida Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.