<br />TECHNICAL AND FINANCIAL PROPOSAL
<br />Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
<br />Pier Park, City of Sunny Isles Beach, FL
<br />
<br />SECTION 5 - REFERENCES & EXPERIENCE
<br />
<br />5.1 Summary of Personnel Qualification/Experience
<br />
<br />William "Bill" Evans
<br />Project Managerl
<br />Public Information Officer
<br />
<br />Mr. Evans has over 20 years of project management and public works experience. He is knowledgeable in
<br />implementing business practices to increase work flow and streamline operations. As a former Public Works Director of
<br />City of Sunny Isles beach he directed and oversaw all aspects public works operations. He organized, implemented,
<br />and supervised activities related to city streets, parks, storm water system, buildings and grounds maintenance, fleet
<br />maintenance and hurricane preparedness. He is very familiar with all the aspects of the project from its inception.
<br />
<br />Ronnie S. Navarro, PE
<br />Engineering Consultant
<br />
<br />Mr. Navarro has over 25 years of diverse professional and international experience in general civil engineering,
<br />infrastructure and transportation planning, highway and urban roadway design, project/construction management,
<br />municipal engineering and land development (sanitary sewer design, water supply and distribution, drainage), seaport
<br />and airport development. He is experienced in all aspects of project design and development including the conduct of
<br />project feasibility studies, build-operate-transfer schemes, master plans, preliminary, conceptual, final design, contract
<br />document preparation and administration.
<br />
<br />Javier Quevedo
<br />Marine Construction Supervisor
<br />
<br />Mr. Quevedo has over 12 years of experience in the construction and development industry. Verifiable track record for
<br />the successful completion of multi-million dollar projects through coordinating trades, developing partnerships and
<br />building positive rapport with architects, engineers, local officials, vendors and clients while maintaining costs. Versed
<br />in contract negotiations, project estimating, impending design problems, document preparation, building code and
<br />regulations, material purchasing and site management.
<br />
<br />Cebrone D. Atkins, Jr.
<br />Drilling Superintendent
<br />
<br />Mr. Atkins, has over Sixteen years experience working with the physical forces of the coastal environment with
<br />extensive knowledge of the coastal processes such as waves. tides, currents and the transport of sediment.
<br />Specializing in the construction, maintenance and repair of erosion control projects; such as bulkheads, seawalls,
<br />breakwaters, revetments, groins, jetties, artificial beach nourishment, coastal bluff reshaping, vegetative stabilization
<br />and navigation projects such as docks, cribs, boat ramps and boathouses, marina basins, harbor projects and
<br />dredging. Owning and operating marine equipment, Le. barges, tugs, pumps and cranes in diverse situations.
<br />Confirmable evidence of successful completion of multi-million dollar undertakings in erosion control projects,
<br />navigation projects and harbor projects working with coordinating professionals.
<br />
<br />Page 10 of 15
<br />
|