Laserfiche WebLink
<br />TECHNICAL AND FINANCIAL PROPOSAL <br />Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier <br />Pier Park, City of Sunny Isles Beach, FL <br /> <br />TABLE OF CONTENTS <br /> <br />SECTION 1 - PROJECT OVERVIEW AND ORGANIZATIONAL APPROACH <br />SECTION 2 - PROJECT SCHEDULE <br />SECTION 3 - TECHNICAL APPROACH & METHODOLOGY <br />SECTION 4 - FINANCIAL PROPOSAL <br />SECTION 5 - EXPERIENCE & REFERENCES <br />EXHIBIT "A" SWORN STATEMENT TO PUBLIC ENTITY CRIME <br />EXHIBIT "B" NON-COLLUSIVE AFFIDAVIT <br />BID BOND (TENEX)! STATEMENT OF BONDABILlTY (PALM BEACH MARINE) <br />FINANCIAL STATEMENT <br />LICENSES !INSURANCE ! SUPPLEMENTAL DOCUMENTS <br /> <br />1 <br />6 <br />7 <br />9 <br />10 <br />16 <br />19 <br />21 <br />24 <br />43 <br /> <br />SECTION 1 - PROJECT OVERVIEW AND ORGANIZA TIONAL APPROACH <br /> <br />The City of Sunny Isles Beach intends to <br />demolish and reconstruct the Historic <br />Sunny Isles Beach/Newport Fishing Pier, <br />located at 16701 Collins Avenue. It was <br />originally built in 1936 and designated by <br />the Miami-Dade County Historic <br />Preservation Board as historic site in 1982 <br />and then by the City of Sunny Isles Beach <br />Historic Preservation Board in 2005. <br /> <br /> <br />1.1 Project Understanding <br /> <br />The pier sustained major damage during Hurricane Wilma in 2005 and has been closed to the public ever since <br />due to structural and safety issues. At this time the City intends to demolish the existing pier and restaurant <br />and replace them with brand new structure. The construction plan and specifications has been prepared by <br />the consulting firm, Beiswenger, Hoch and Associates, Inc. for the City for the pier reconstruction. A group of <br />consultants spearheaded by Marlin Engineering, Inc., Beiswenger, Hoch and Associates, Inc. (for <br />Architecture), Project Caine (for MEP) and Botas Engineering, Inc. (for Structural) prepared the construction <br />plans and technical specifications for the restaurant. These plans and technical specifications are the basis <br />for this technical and financial proposal. <br /> <br />Our Team will be responsible for demolition and construction of all the improvements as described in the <br />scope of work as prepared by a team of Consulting Engineers and Architects identified above and as itemized <br />in our Schedule of Values. This work will be completed within 11-12 months as outlined in the proposed <br />schedule provided in Section 2. <br /> <br />Page 2 of 15 <br />