Laserfiche WebLink
<br />- <br /> <br />RFP No. 10-07-02 <br />August 17,2010 <br />Page 2 of3 <br /> <br /> Restaurant <br />11 Structure 1 LS $770,433 $770,433 <br />12 Electrical 1 LS $162,022 $162,022 <br />13 Plumbing 1 LS $85,440 $85,440 <br />14 HVAC 1 LS $66,112 $66,112 <br /> Restaurant Subtotal $1,084,007 <br /> <br />1. Permit Fee Allowance <br />We have included an allowance for State and DERM permit fees. These costs are estimated only, actual costs to be paid <br />by owner. <br />2. Mobilization <br />Includes one complete site mobilization and demobilization of SFI's barge, Crane and equipment. <br />3. General Conditions <br />This item includes SFI's direct site costs such as: provide and maintain site safety fencing and signage, floating turbidity <br />barriers temporary sanitary facilities for our crews, roll-off refuse containers and disposal fees. <br />4. Demolition of Existing Structures <br />Includes demolition and legal disposal of all existing structures and support piling as depicted in the referenced bid <br />documents. <br />5. Reinforced Concrete (Substructure) <br />Includes all labor, equipment, materials to cast-in-place all required, pile caps, restrainers, diaphragms as depicted in the <br />bid documents including Grade 60 reinforcing and 5,500-psi concrete. <br />6. Pre-Stressed Beams <br />Includes supply and installation of approximately 1,408 linear feet of pre-cast, pre-stressed Florida Double Tee's as per <br />the bid documents. <br />7. Pre-Stressed Concrete Piling (24" Square) <br />Includes supply and installation of approximately (104) 24" square pre-cast, pre-stressed concrete piling of varying <br />lengths. Includes pier and restaurant piling. <br />8. Test Pile <br />Includes (9) 24" square pre-cast, pre-stressed concrete piling of varying lengths, embedded data collectors, PDA testing <br />and reports. <br />9. Pipe Handrail <br />Includes supply and installation of Saftron handrail system as depicted in the bid documents. <br />10. Class V Coating <br />Includes class V coating of the double tee's and piling as indicated in the bid documents. <br />11. Restaurant Structure <br />Includes cast-in-place elevated slabs, structural concrete, stucco, painting, insulation, windows, doors, standing seam <br />roofing, interior finishes and appurtenances as indicated in the bid documents. <br />12. Electrical <br />Includes installation of a fully functional system as depicted in the bid documents. <br />13. Plumbing <br />Includes installation of a fully functional potable water and fire suppression system as depicted in the bid documents. <br />14. HV AC <br />Includes installation of a fully functional a/ c system including air handler and ductwork per the bid documents. <br /> <br />2781 S.W. 56ln Avenue. Pembroke Park, Florida 33023 <br />Phone: (954) 985-0460 . Fax: (954) 985-0462 . www.shorelinefoundation.com <br /> <br />Members of: <br />Members of: Deep Foundation Institute. Pile Drivers Contractors Association. CASF <br />