Laserfiche WebLink
<br />Below is a small sample of the 100+ marine proj ects "completed by <br />Bunnell Foundation since 1972, ranging in value from $100,000 to <br />$5,000,000. <br /> <br />Item Year Client - Job Name Job Description Amount <br /># <br />73. 2005 Taubco Property Development 450' Auger Cast Foundation Piles $230.000.00 <br /> Indian Creek Drive, FL <br />74, 2005 Ben Leon 180 LF Seawall Reinforcement / 490 SF $135,000.00 <br /> Coral Gables. FL Concrete & IPE Hard Wood Dock / 20,000 <br /> Ibs. Aluminum Boat Lift <br />75. 2005 Eagle Tire Co, / Pioneer Shipping Reconstruction of266' of Collapsed Seawall $500,000,00 <br /> Miami River 20' Return Wall. <br />76. 2005 Pavarini Construction 10' x 10' Three Sided Steel Cofferdam $177,000.00 <br /> Miami. FL <br />77. 2005 Coscan Construction 842' Long Seawall $ 300,500.00 <br /> A ventura. FL <br />78. 2005 WFB Builders Reconstruction of Docking Structure $ I 41 ,000.00 <br /> Miami. FL <br />79. 2005 Pumpkin Cay Condo. No. 13 . Construction of New 36 Slip Floating Dock $600,000.00 <br /> Key Largo. FL Mooring Facility <br />80. 2006 Ocean Reef Marina 490' Long Seawall Reinforcement $660,000.00 <br /> Fishin~ Village - Kev Lanw, FL <br />81. 2006 University of Miami Pier Renovation $477.000.00 <br /> Rosenstiel School of Marine & <br /> Atmospheric Science <br />82. 2006 Moss & Associates 843' Long New Steel Sheet Seawall Concrete $253,000.00 <br /> Pumpkin Cay # 9 - Ocean Reef, FL Cap & 3,372 SF Timber Dock Replacement <br />83. 2006 CMC Construction Floating Dock Facility $800,000.00 <br /> Biscayne Bay Spoil Island <br /> Enhancement Project <br />84. 2006 Consolidated Marine Enterprises Finger Docks Removal and Replacement $95.000.00 <br /> Biscayne National Park <br />85. 2006 GM Atrium. LLC. Docks and Seawall Construction $515,000.00 <br /> Atrium at A ventura, FL <br />86. 2006 Sandler at Greater Marathon Temporary Finger Piers $130.000.00 <br /> Marathon. FL <br />87. 2006 Loft Marina, LLLP (Artech) New 43 Slips Marina $740,000.00 <br /> A ventura, FL <br />88. 2006 Weitz Company Install 536 LF of Temporal}' Steel Sheet $206,000.00 <br /> The Place Piling wall <br />89. 2006 Sandler at Greater Marathon 2,965" Long Seawall Replacement & Debris $2.200,000.00 <br /> Marlin Bay Yacht Club Removal <br />90 2006 Key Largo Anglers Club 3,493 SF Concrete Floating Dock & 600 SF $400,000.00 <br /> 50 Club House Road. Key Largo. Fixed Dock <br /> FL <br />91. 2007 Ray Larkin 92' Long Seawall Refurbishment & Wood $ 111.000.00 <br /> Ocean Reef. FL Dock <br />92. 2007 Lennar Developers, Inc. Docking Facility $1.300.000.00 <br /> 360 Condominium <br />93. 2007 CMC Construction Replacement and Repair of Existing Dock $1.200,000,00 <br /> Dupont Plaza <br />94. 2008 Prudential-Johnston's Residence 125' Long Steel Sheet Seawall $ 209,450.00 <br /> 41 Bayridge Drive <br />