Laserfiche WebLink
<br /> x $ $ <br /> 50 Hours <br />B6 One Irrigation Specialist (All other times) Per <br /> Hour = <br /> X $ $ <br /> 75 Hours <br />B7 One Irrigation Laborer (Sam - 5pm, M-F) Per <br /> Hour = <br /> X $ $ <br /> 50 Hours <br />B8 One Irrigation Laborer (All other times) Per <br /> Hour = <br /> $ <br />B SUBTOTAL <br />C. EQUIPMENT X $ $ <br />Cl One Front End Loader with Backhoe, including an 250 Hours <br />Operator Per <br /> Hour - <br /> X $ $ <br />C2 One Front End Loader with Backhoe, including an 30 Days <br />Operator Per <br /> Dav - <br /> X $ $ <br />C3 One Front End Loader with Backhoe, including an 4 Weeks <br />Operator Per <br /> Week - <br /> X $ $ <br />C4 One Front End Loader with Backhoe, including an 1 Month <br />Operator Per <br /> Month - <br /> X $ $ <br />C5 One 15,000 GVW (or larger) Dump Truck with an 100 Hours <br />Operator Per <br /> Hour - <br /> X $ $ <br />C6 One 15,000 GVW (or larger) Dump Truck with an 10 Days <br />Operator Per <br /> Dav - <br /> X $ $ <br />C7 One 15,000 GVW (or larger) Dump Truck with an 1 Week <br />Operator Per <br /> Week - <br /> X $ $ <br />C8 One 15,000 GVW (or larger) Dump Truck with an 1 Month <br />Operator Per <br /> Month = <br /> <br />PAGE 35 OF 96 <br />BID No. <br />