Laserfiche WebLink
<br />shall not be paid for separately. <br /> <br />K2. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and <br />other miscellaneous necessities to and properly maintain the clay infield on the baseball diamond at <br />Pelican Community Park. This will include dragging the field, servicing the pitcher's mound, and <br />replacing any materials necessary to have an excellent playing surface. <br /> <br />K3. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and <br />other miscellaneous necessities to stripe the baseball field in Pelican Community Park. This shall <br />include the foul lines (to the outfield fence) and all accompanying areas, using chalk powder, the <br />striping shall be done to industry standards and shall follow the recommendations of the <br />manufacturer. <br /> <br />K4. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and <br />other miscellaneous necessities to properly stripe the soccer field at Gwen Margolis Park. This will <br />require striping all lines necessary to provide an appropriate regulation field, using paint. The striping <br />shall be done to industry standards and shall follow the recommendations of the manufacturer. <br /> <br />K5. This bid item is to is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, <br />and other miscellaneous necessities to repair or replace any netting or screening at the baseball field <br />in Pelican Community Park. The repairs are to be made only upon authorization of the City, but the <br />Bidder is responsible for immediately notifying the City of any holes or openings that are found during <br />the daily servicing and inspection of the park. The repairs will be done to industry standards and shall <br />follow the recommendations of the manufacturer. <br /> <br />K6. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and <br />other miscellaneous necessities to pressure clean sidewalk areas as specifically directed by the City. <br />This bid item is intended to cover unique situations (such as an accident that leaves debris or staining) <br />on the City's sidewalks, streets, parking lots, or other areas. This item is separate and unique from <br />the general bid items also listed in this package that cover pressure cleaning, and the bid price shown <br />for those items will be considered full and total payment for all normal ongoing operations. For <br />payments under this item, or any other, the service must be specifically requested by the City for a <br />unique and specific task. In areas of traffic, the bid will include all appropriate traffic control devices <br />that conform to an approved Management of Traffic (MOT) plan. All traffic control costs shall be a <br />part of the unit price bid and shall not be paid for separately. <br /> <br />K7. This bid item is to include the supplying of all necessary supplies, labor, equipment, fuel, and other <br />miscellaneous necessities to replace or repair street signs (stop signs, street name signs, yield signs, <br />etc.) on City properties (does not include FDOT roadways such as Collins Avenue and Sunny Isles <br />Boulevard). The City will purchase and supply the sign boards and provide them to the Bidder. This <br />bid item is intended to cover unique situations (such as an accident that causes damage to a sign or <br />sign post) on the City's streets. This item is separate and unique from the general bid items also <br />listed in this package that cover regular maintenance, and the bid price shown for those items will be <br />considered full and total payment for all normal ongoing operations. For payments under this item, or <br />any other, the service must be specifically requested by the City for a unique and specific task. In <br />areas of traffic, the bid will include all appropriate traffic control devices that conform to an approved <br />Management of Traffic (MOT) plan. All traffic control costs shall be a part of the unit price bid and <br />shall not be paid for separately. <br /> <br />K8. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and <br />other miscellaneous necessities to collect shopping carts from public property and return them to the <br />owner. For the Bidder to receive payments under this item, the service must be specifically requested <br /> <br />PAGE 55 OF 96 <br />BID No. <br />