|
<br />shall not be paid for separately.
<br />
<br />K2. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and
<br />other miscellaneous necessities to and properly maintain the clay infield on the baseball diamond at
<br />Pelican Community Park. This will include dragging the field, servicing the pitcher's mound, and
<br />replacing any materials necessary to have an excellent playing surface.
<br />
<br />K3. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and
<br />other miscellaneous necessities to stripe the baseball field in Pelican Community Park. This shall
<br />include the foul lines (to the outfield fence) and all accompanying areas, using chalk powder, the
<br />striping shall be done to industry standards and shall follow the recommendations of the
<br />manufacturer.
<br />
<br />K4. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and
<br />other miscellaneous necessities to properly stripe the soccer field at Gwen Margolis Park. This will
<br />require striping all lines necessary to provide an appropriate regulation field, using paint. The striping
<br />shall be done to industry standards and shall follow the recommendations of the manufacturer.
<br />
<br />K5. This bid item is to is to include the supplying of all necessary materials, supplies, labor, equipment, fuel,
<br />and other miscellaneous necessities to repair or replace any netting or screening at the baseball field
<br />in Pelican Community Park. The repairs are to be made only upon authorization of the City, but the
<br />Bidder is responsible for immediately notifying the City of any holes or openings that are found during
<br />the daily servicing and inspection of the park. The repairs will be done to industry standards and shall
<br />follow the recommendations of the manufacturer.
<br />
<br />K6. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and
<br />other miscellaneous necessities to pressure clean sidewalk areas as specifically directed by the City.
<br />This bid item is intended to cover unique situations (such as an accident that leaves debris or staining)
<br />on the City's sidewalks, streets, parking lots, or other areas. This item is separate and unique from
<br />the general bid items also listed in this package that cover pressure cleaning, and the bid price shown
<br />for those items will be considered full and total payment for all normal ongoing operations. For
<br />payments under this item, or any other, the service must be specifically requested by the City for a
<br />unique and specific task. In areas of traffic, the bid will include all appropriate traffic control devices
<br />that conform to an approved Management of Traffic (MOT) plan. All traffic control costs shall be a
<br />part of the unit price bid and shall not be paid for separately.
<br />
<br />K7. This bid item is to include the supplying of all necessary supplies, labor, equipment, fuel, and other
<br />miscellaneous necessities to replace or repair street signs (stop signs, street name signs, yield signs,
<br />etc.) on City properties (does not include FDOT roadways such as Collins Avenue and Sunny Isles
<br />Boulevard). The City will purchase and supply the sign boards and provide them to the Bidder. This
<br />bid item is intended to cover unique situations (such as an accident that causes damage to a sign or
<br />sign post) on the City's streets. This item is separate and unique from the general bid items also
<br />listed in this package that cover regular maintenance, and the bid price shown for those items will be
<br />considered full and total payment for all normal ongoing operations. For payments under this item, or
<br />any other, the service must be specifically requested by the City for a unique and specific task. In
<br />areas of traffic, the bid will include all appropriate traffic control devices that conform to an approved
<br />Management of Traffic (MOT) plan. All traffic control costs shall be a part of the unit price bid and
<br />shall not be paid for separately.
<br />
<br />K8. This bid item is to include the supplying of all necessary materials, supplies, labor, equipment, fuel, and
<br />other miscellaneous necessities to collect shopping carts from public property and return them to the
<br />owner. For the Bidder to receive payments under this item, the service must be specifically requested
<br />
<br />PAGE 55 OF 96
<br />BID No.
<br />
|