My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 10-05-01 Landscape Maint. (Canceled)
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2010 4:18:57 PM
Creation date
11/8/2010 4:18:28 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance
Bid No. (xx-xx-xx)
10-05-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />damage caused by operation of the equipment. All equipment will be inspected and evaluated by the <br />City of Sunny Isles Beach, prior to award of this bid. The following equipment shall be located at the <br />storage satellite facility in the event of emergencies and be available to the City within the required <br />time frames: <br />. FDOT compliant arrow board and 75 FDOT compliant traffic cones. <br />. Backhoe-front end loader <br />. Twenty cubic yard dump truck <br />. Hydraulic 65 foot bucket truck <br />The City. at its sole discretion. may require that any of the special equipment be located in the <br />satellite storaqe site as specified herein. <br /> <br />L3. Special equipment required (in addition to Standard Maintenance Equipment). <br />. One 400 gallon portable water sprayer and one (1) 2500 PSI pressure washer. <br />. FDOT Compliant arrow board and 75 FDOT compliant traffic cones. <br />. Three fertilizer spreaders. <br />. One pull behind aerator, subject to Landscape Architect approval. <br />. Portable Stump Grinder 6" below grade <br />. Underground wiring location equipment <br />· Two hydraulic bucket-trucks with a reach capacity of no less than 65 feet. <br />· One backhoe/front end loader combination machine (equivalent to a Ford F555 or larger.) <br />. One 24 foot minimum vertical man lift (pole cat or equivalent). <br />· Two portable brush chippers with 20 cu yard capacity storage truck. <br />. Two twenty-cubic-yard capacity dump trucks. <br />. One Utility Box Truck or Van. <br />. One portable gasoline generator (5000 W Minimum) <br />. Two 60" three gang hydrostatic reel mowers. (5 blades per reel min.) <br />. One 21" Reel Mower (5 blades) <br />. Four utility carts that can traverse landscaped areas without damaging plants or irrigation. <br />· One Skid-steer Loader with the following accessories: Tree Boom, Fork, Bucket, and Auger. <br />· A two-way communication system between all of the Contractors service vehicles, their <br />main office, and City personnel. <br />The Contractor must own or have leased the following equipment at the time of bid submittal. The <br />City may require proof of such ownership or lease agreement at its sole discretion. <br /> <br />L4. The Contractor must possess the following licenses and keep them current throughout the term of the <br />Contract: Pest Control Applicator License issued by the State of Florida; Dade County Occupational <br />License; and City of Sunny Isles Beach Occupational License (Local Business Tax). <br /> <br />L5. The Contractor must operate at least one storage and mobilization site within a five mile radius of the <br />City limits of the City of Sunny Isles Beach, within 60 days of award. The storage site may be totally <br />enclosed or may be open and surrounded by a six foot height, lockable, chain-link fence. The storage <br />site must have a minimum of 2000 sq. ft. area, with a minimum 600 sq. ft. of fully enclosed, lockable, <br />and secure materials storage area, and must be continually available to the Contractor for the full <br />duration of this contract. The City reserves the right to inspect this facility prior to award of bid, and <br />at any time during the course of this contract. The Contractor will have 60 days to secure the storage <br />site after award of contract. <br /> <br />L6. The Contractor shall maintain the contractually covered landscaped areas at the frequency rate <br />prescribed with conventional production style mowing and lawn maintenance equipment. A manicured <br />professionally groomed appearance is the desired result. The Contractors work will be inspected by <br />the City and the City's Landscape Architect. The Contractor shall maintain all other areas as required <br />by City during the course of this contract. The Contractor shall adhere to City noise ordinance. <br /> <br />PAGE 57 OF 96 <br />BID No. <br />
The URL can be used to link to this page
Your browser does not support the video tag.