Laserfiche WebLink
<br />L13. The Contractor shall be available to meet with all public utilities to locate all irrigation and hydraulic <br />lines prior to excavation by the utility company. The Contractor is to act as the City's representative in <br />order to avoid unnecessary damage to irrigation lines. <br /> <br />L14. No fuel, oils, solvents, or similar materials are to be disposed of in any catch basins. The Contractor <br />must closely adhere to local, state, and Federal Environmental Protection Agency requirements, and is <br />responsible for all non-compliance penalties. <br /> <br />L15. The Contractor must have substantial experience in the large scale landscape and irrigation <br />maintenance of parks, public rights-of-way including medians and high traffic roadways. This <br />experience must include a minimum of five years experience in this type of work, including the <br />maintenance of a wethose or similar sub-surface irrigation system. Proof of such shall be required at <br />bid submittal. <br /> <br />L16. Aerial spraying of trees, with the exception of Royal Palms, is prohibited. <br /> <br />L17. The Contractor, at his satellite storage facility, must maintain an adequate supply of lumber for <br />bracing of fallen trees. <br /> <br />L18. All irrigation lines are to be flushed, cleaned, and maintained monthly, or as required to maintain the <br />required water flow. All valves, controllers, and other components must be maintained on a regular <br />basis at no additional charge. This will include, but not be limited to, the checking of breaks in the <br />lateral lines. All irrigation breaks or malfunctions must be repaired by the Contractor within 24 hours <br />notification by City (including weekends). This includes all vehicular damage to irrigation and/or <br />landscape materials. Furthermore, all damages noticed by Contractor shall be reported to City within <br />24 hours. <br /> <br />L18.1. Requirements for existing irrigation system on Collins Avenue median: <br /> <br />L.18.1.1.The Collins Avenue median is irrigated through a 'wethose' subsurface irrigation <br />system supplied by City water meters, with the exception of median island 'bullnoses' <br />which are watered with overhead irrigation. <br /> <br />L18.2. Required on-going maintenance as follows: <br /> <br />L18.2.1 Monthly - Turn system on with controllers and check program. Ajust program as <br />needed for seasons, new plantings, and weather conditions. Verify that system is running 20 <br />minutes on and 20 minutes off, per cycle, to prevent 'wethose' hydration (decrease leak rate). <br />Suggested frequency of watering (will vary based on rainfall) is 5 cycles per day/5 days per <br />week during dry season and 4 cycles per day/3 days per week during wet season. Visually <br />inspect valves, filters, and backflow preventers for malfunction or damage and repair as <br />needed. With system running, visually inspect for PVC pipe breaks or 'wethose' needing <br />repairs. Always make repairs to all PVC or 'wethose' pipe after flushing the pipe. After repairs <br />are complete, turn the system on to verify that no additional work is required. <br /> <br />L18.2.2.Quarterly - In addition to monthly maintenance schedule, open flush ports and let <br />water run a minimum of 3 minutes. Check filter elements for excess residual and replace if <br />needed. <br /> <br />L18.2.3.Annually - In addition to monthly maintenance schedule, replace filter elements and <br />controller batteries. Chemically flush system using 'Disolve' (this process will remove iron, <br />calcium, and other buildup on the inside of the 'wethose' and PVC pipe). <br /> <br />PAGE 59 OF 96 <br />BID No. <br />