Laserfiche WebLink
<br />shall apply Daconil fungicide at the first appearance of fungus and following the manufacturer's <br />instructions for application methods and amounts. <br /> <br />L31. For fungus control on Bermuda turf, the Contractor shall use two applications of Revere, Subdue, or <br />approved equal. The first application is to occur in March and the second application is to occur in <br />September. <br /> <br />L32. For weed control, on Bermuda turf, the Contractor shall use two applications of Pendulum or Ronstar. <br />The first application is to occur in March and the second application is to occur in September, following <br />the manufacturer's instructions for application methods and amounts. <br /> <br />L33. For fertilization on Bermuda turf, the Contractor shall apply Lesco 13-2-13 a minimum of twelve times <br />per year. The Contractor is responsible for contracting with a laboratory approved by the City, to <br />complete two soil analysis per year to verify the minor element requirements, and adjust fertilizer <br />application as needed. The Contractor will submit soil analysis to City for review by City Landscape <br />Architect. <br /> <br />L34. The Contractor shall aerate Bermuda turf with a turf aerator each month (12 times per year), and shall <br />coordinate dates for this work with the City. The mowing of all other areas (except Bermuda turf) <br />shall occur every ten calendar days from October 1st through April 1st and every seven calendar days <br />from April 1st through October 1st (44 cuts). Remove and properly dispose of all visible grass clippings <br />from curbs, gutters and general site. <br /> <br />L35. To maintain the ballfield, the Contractor shall drag, grade, stripe, and smooth the clay infield, <br />including base paths (days to be determined by City, including Sundays). The City will advise the <br />Contractor of additional field preparation, as needed, with a minimum of six hours notice. The <br />Contractor shall tamp mound area two times per week and fill in existing holes with available clay <br />(supplied by Contractor) and firm the area with a hand tamp. <br /> <br />L36. The Contractor shall edge, as required, to maintain a neat, clean appearance to maintain the shape of <br />planting beds as originally designed. <br /> <br />L37. The Contractor shall lift all trees over 20' height and adjacent to walks and vehicular areas to a <br />minimum of 12' of clear trunk, and maintain minimum of 8' clear trunk for all other trees. The <br />Contractor shall trim shrubs and ground cover, as needed. On SR AlA (Collins Avenue) the Contractor <br />shall trim shrubs and groundcover, as needed, to meet the criteria set forth in FDOT Index 546, which <br />mandates a maximum height of 24" from top of adjacent curb, remove dead and dying fronds from <br />palms, as needed, for a clean appearance, but shall use no climbing spikes. The Contractor shall Trim <br />Coconut Palms (frond and fruit removal) three times per year, selectively trim existing trees in <br />accordance with Tree Care Industry Association and Dade County standards and practices, to maintain <br />a minimum of 8 feet of clear trunk, and remove suckers, shoots, and dead or dying branches. All tree, <br />palm, and shrub pruning is included in this contract. When trimming Phoenix Dactilifera (Date Palm), <br />the Contractor shall completely dip trimming utensils in a solution of 50% chlorine and 50% water <br />prior to moving to adjacent palm. The Contractor shall not do major tree or shrub pruning between <br />November 1st and March 15th, unless requested by City. The Contractor shall maintain integrity of <br />original design when trimming and shall not box plants whose habits of growth do not lend themselves <br />to this type of trimming. The Contractor shall not use a machete for trimming, shall haul away all <br />trimming debris from site, and properly dispose of at Contractor's expense. <br /> <br />L38. The Contractor shall hand pull weeds in shrub and ground cover area, as needed to maintain a clean <br />appearance, apply approved herbicides, as needed, to control weeds in sidewalk, curb, catch basins, <br />and gutter areas, haul away all trimming debris from site, and properly dispose of at Contractor's <br />expense. Empty and dispose of contents of all trash containers on a daily basis, including weekends <br /> <br />PAGE 63 OF 96 <br />BID No. <br />