Laserfiche WebLink
<br />12. NAME <br />Roberto Sequeira, AlA <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Comolete one Section E for each kev oerson.) <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT FIRM <br />33 24 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Heery International Inc., Coral Gables, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />UNIVERSITY OF FLORIDA <br />Master of Arts in Architecture, 1977 <br />Bachelor of Design in Architecture, 1975 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Architect <br />State of Florida <br />R.A. #9035 (1981) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Certified General Contractor. Florida 1977 <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Intermodal Center, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2010 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Principal in Charge A Rental Car Facility (RCF), in which rental car companies (22) serving Miami International Airport, will locate their <br /> ready return, fueling, and washing ops. & company offices. 22 Acres per level, with 3500 parking spaces. Estimated Const. Cost is <br /> $340,000,000. 4,000,000 SF. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Early Baggage Storage Facility, Miami International Airport, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2009 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Principal-in-Charge responsible for overall coordination of the project. This 50,000 SF facility is designed to serve as American <br /> Airline's primary baggage sorting and storage facility for "early arriving passenger's luggage". Early arriving luggage is sorted through six piers <br /> and stored there until their intended plane arrives at a gate. Cost: 4,500,000.00 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Emergency Operations Center, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2000 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Principal in Charge The facility will house the City Manager, Assistant City Managers., Fire Chief, Police Chief, Dept. Directors & <br /> immediate subordinates in addition to 20 other Administrators from various City Depts. and up to (6) other municipalities. Construction Cost <br /> Phase I - $150,000 Phase II - $350,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Homestead Bayfront Park Harbor Master Building, Homestead, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2009 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal-in-charge: Overall coordination, the ground level has a new public restroom, vertical access and limited storage. The design provides a <br /> shared elevator, multipurpose room, a small kitchenette area, three private offices, conference room, storage room, copy & file area and a toilet. <br /> Design takes into account ventilation and other green building attributes, 5,000 SF and estimated construction costs of$2,000,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Kiwanis Club of Little Havana, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) <br /> 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Principal-in-charge responsible for overall coordination of this two story building and Interior Renovation. The facility includes a lounge area on <br /> the second floor, general office space on the first floor, as well as a large storage space. Adjacent to the building there is a parking lot for <br /> visitors. Contract Amount: $528,000. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br /> <br />Total Document 26 of 50 <br />