|
<br />12. NAME
<br />Roberto Sequeira, AlA
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Comolete one Section E for each kev oerson.)
<br />13. ROLE IN THIS CONTRACT
<br />Principal-in-Charge
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL I b. WITH CURRENT FIRM
<br />33 24
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Heery International Inc., Coral Gables, FL
<br />
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON)
<br />UNIVERSITY OF FLORIDA
<br />Master of Arts in Architecture, 1977
<br />Bachelor of Design in Architecture, 1975
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Registered Architect
<br />State of Florida
<br />R.A. #9035 (1981)
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
<br />Certified General Contractor. Florida 1977
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miami Intermodal Center, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> 2010
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Role: Principal in Charge A Rental Car Facility (RCF), in which rental car companies (22) serving Miami International Airport, will locate their
<br /> ready return, fueling, and washing ops. & company offices. 22 Acres per level, with 3500 parking spaces. Estimated Const. Cost is
<br /> $340,000,000. 4,000,000 SF.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Early Baggage Storage Facility, Miami International Airport, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> 2009
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Role: Principal-in-Charge responsible for overall coordination of the project. This 50,000 SF facility is designed to serve as American
<br /> Airline's primary baggage sorting and storage facility for "early arriving passenger's luggage". Early arriving luggage is sorted through six piers
<br /> and stored there until their intended plane arrives at a gate. Cost: 4,500,000.00
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Miami Emergency Operations Center, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> 2000
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Role: Principal in Charge The facility will house the City Manager, Assistant City Managers., Fire Chief, Police Chief, Dept. Directors &
<br /> immediate subordinates in addition to 20 other Administrators from various City Depts. and up to (6) other municipalities. Construction Cost
<br /> Phase I - $150,000 Phase II - $350,000.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Homestead Bayfront Park Harbor Master Building, Homestead, FL PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> 2009
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Principal-in-charge: Overall coordination, the ground level has a new public restroom, vertical access and limited storage. The design provides a
<br /> shared elevator, multipurpose room, a small kitchenette area, three private offices, conference room, storage room, copy & file area and a toilet.
<br /> Design takes into account ventilation and other green building attributes, 5,000 SF and estimated construction costs of$2,000,000.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Kiwanis Club of Little Havana, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
<br /> 2005
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
<br /> Principal-in-charge responsible for overall coordination of this two story building and Interior Renovation. The facility includes a lounge area on
<br /> the second floor, general office space on the first floor, as well as a large storage space. Adjacent to the building there is a parking lot for
<br /> visitors. Contract Amount: $528,000.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
<br />Total Document 26 of 50
<br />
|