Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL <br /> (Complete one Section E for each key person) <br />12. NAME: 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Aris Garcia. AlA Lead Designer <br /> a. TOTAL I b. WITH CURRENT FIRM <br /> 25 22 <br />15. FIRM NAME AND LCOATION (CITY AND STATE) <br />Wolfberg Alvarez & Partners. Inc., 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146 <br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />1983/Bachelor of Architecture/ University of Miami 1995/Registered Architect/Florida/#AR15263 <br />Graduate studies toward Masters of Urban Planning Registered Interior Designer/ Florida # ID 3665 <br /> NCARB Certification <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Etc.) <br />Mr. Garcia is experienced in all phases of planning and project development. from preliminary concepts and programming through final <br />design and production of construction documents, for both private and public sector clients. He has been involved in numerous projects <br />for new construction, renovations and interior alterations to various schools and government facilities throughout South Florida. <br /> 19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> Three AlE Consulting Contracts with GSA. Region 4 for New Con- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> struction and Improvements to US Post Offices, Courthouses and 1987-1990,1991-1994, 1987 -1990, 1991-1994. <br /> Other Federal Buildings throughout the Southeastern US. 1995-1998 1995-1998 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Manager for three (3) separate consulting contracts involving AlE investigations and design, as well as construction administra- <br />tion services, for a variety of alterations and improvements to US Post Offices and Federal buildings in the Southeastern United States. <br />X Check if Project performed with current firm. <br />b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> Vizcaya Museum and Gardens Miscellaneous Continuing PROFESSIONAL SERVICES T CONSTRUCTION (If Applicable) <br /> Contract, Miami. FL 2009 2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Principal-in-charge for Architectural and Engineering services to the Historic Vizcaya Museum and Gardens. The projects under this <br />contract include Architectural restorations, re-roofing, re-painting. ADA enhancements. Electrical Upgrades, Stormwater Discharge <br />Management System and new building construction. In addition to the project scope WA also is assisting in the bidding and permitting <br />phase of the project along with Construction Administration services. <br />X Check if Proiect performed with current firm. <br />c. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> Renovation and Energy Retrofit of Public Schools, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> County. FL 2001-2003 2001-2003 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc,) AND SPECIFIC ROLE <br />Project Manager for Architectural services for investigations and design for renovation and retrofit of elementary, junior and <br />senior high schools including the renovation of Miami Beach Senior High School including modernization of the auditorium and <br />renovation to Miami Center Central High. Various projects ranging is cost from $100,000 to $1,000,000. <br />X Check if Proiect oerformed with current firm. <br />d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> General Consultant Contract for Village of Pinecrest, Pinecrest. FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2002 2004 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Manager for multi-disciplined engineering and architectural support services the City for a variety of projects. This included fea- <br />sibility studies and reports. planning. additions and improvements, upgrading of engineering systems, site planning and improvements. <br />Preparation of construction documents. <br />X Check if Project performed with current firm. <br />e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED <br /> City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES T CONSTRUCTION (If Applicable) <br /> 2008-2009 2008-2009 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Manager for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing sys- <br />tem and site improvements including a new parking lot with drainage and fencing for security. Other tasks include ADA upgrades to <br />building around the City. Project cost varies from $50.000 to $250,000. <br />X Check if Proiect oerformed with current firm. <br /> <br />Wolfberg Alvarez and Partners <br /> <br />STANDARD FORM 330 (1/2004) <br />