|
<br /> E. RESUMES OF KEY PERSONNEL
<br /> (Complete one Section E for each key person)
<br />12. NAME. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Rafael Guissarri, AlA, LEED AP Project Architect a. TOTAL I 3 WITH CURRENT FIRM
<br /> 9
<br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />Bachelor of Science Architecture, Universidad de Registered Architect / Florida # AR93858
<br />Belgrano Buenos Aires, Argentina 1998
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Eta)
<br /> 19. RELEVANT PROJECTS
<br />a. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED
<br /> Florida City Youth Community Center, PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Florida City, FL 2008 2010
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Architect for a new 21,500 SF youth activity and community center for the City of Florida City. The cen-
<br />ter features a wide range of activities for specialized uses including an indoor basketball gym with folding
<br />bleachers that seat 240 people. The buildings surround a secure open courtyard in which social activities and
<br />other events can take place.
<br />x Check if Proiect performed with current firm.
<br />b. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED
<br /> GSA Fleet Shop 1 Maintenance Facility, PROFESSIONAL SERVICES I CONSTRUCTION2fOprOble)
<br /> Miami, FL 2008
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Architect for a new light vehicle maintenance facility for Miami-Dade County with 28 service bays, vehi-
<br />cle parking with approximately 475 spaces and 20,000 SF of general office space. Total building area is ap-
<br />proximately 252,000 GSF. The facility will have an adjacent fueling island and emergency back-up system to
<br />allow for operations after a storm event. This building will be LEED Silver.
<br />x Check if Proiect oerformed with current firm.
<br />c. (1) TITLE AND LOCATION (efty and State) (2) YEARS COMPLETED
<br /> Kaplan University Administration Building, PROFESSIONAL SERVICES I CONSTRUCTION2tOOigble)
<br /> Ft. Lauderdale, FL 2008
<br />(3) BRIEF DESCRIPTION (Briet Scope. size, cost, etc.) AND SPECIFIC ROLE
<br />Project Architect for a new 200,000 GSF, Class A multi-story support building. Building included ultra-modern
<br />classrooms and research laboratories the building houses 960 office spaces, a 300-person mission conference
<br />center with observation deck, training rooms, computer rooms, multi-media conference rooms, technical librar-
<br />ies, snack bar/cafeteria, storage, internal and external employee break areas, retail, miscellaneous support
<br />areas and parking.
<br />x Check if Project performed with current firm.
<br />d. (1) TITLE AND LOCATION (efty and state) (2) YEARS COMPLETED
<br /> Village of Palmetto Bay Community Center & Li- PROFESSIONAL SERVICES I CONSTRUCTION2fOOgble)
<br /> brary, Village of Palmetto Bav, FL 2006
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Architect for a new 15,000 SF Community Center and Library. The two-story Community Center will
<br />offer a meeting and performance space for events, lectures, and community activities. The first story will be
<br />dedicated to theatre space for special performances and serve as an additional outdoor area for lectures,
<br />workshops and children's activities.
<br />x Check if Project performed with current firm.
<br />e. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED
<br /> Miami-Dade County Public Schools Information PROFESSIONAL SERVICES 1 CONSTRUCTION2100Igable)
<br /> Technology Systems Building, Miami, FL 2008
<br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
<br />Project Architect for the tasks of preparing a report of the existing conditions and evaluate the prospects of up-
<br />grading/replacing the electrical system components and related emergency equipment. This report addresses
<br />the existing configuration of the main normal electrical service, emergency power generation, and UPS sys-
<br />tems and will provide recommendations.
<br />x Check if Proiect performed with current firm.
<br />
<br />Wolfberg Alvarez and Partners
<br />
<br />STANDARD FORM 330 (1/2004)
<br />
|