Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL <br /> (Complete one Section E for each key person) <br />12. NAME. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Rafael Guissarri, AlA, LEED AP Project Architect a. TOTAL I 3 WITH CURRENT FIRM <br /> 9 <br />16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />Bachelor of Science Architecture, Universidad de Registered Architect / Florida # AR93858 <br />Belgrano Buenos Aires, Argentina 1998 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Eta) <br /> 19. RELEVANT PROJECTS <br />a. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED <br /> Florida City Youth Community Center, PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Florida City, FL 2008 2010 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Architect for a new 21,500 SF youth activity and community center for the City of Florida City. The cen- <br />ter features a wide range of activities for specialized uses including an indoor basketball gym with folding <br />bleachers that seat 240 people. The buildings surround a secure open courtyard in which social activities and <br />other events can take place. <br />x Check if Proiect performed with current firm. <br />b. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED <br /> GSA Fleet Shop 1 Maintenance Facility, PROFESSIONAL SERVICES I CONSTRUCTION2fOprOble) <br /> Miami, FL 2008 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Architect for a new light vehicle maintenance facility for Miami-Dade County with 28 service bays, vehi- <br />cle parking with approximately 475 spaces and 20,000 SF of general office space. Total building area is ap- <br />proximately 252,000 GSF. The facility will have an adjacent fueling island and emergency back-up system to <br />allow for operations after a storm event. This building will be LEED Silver. <br />x Check if Proiect oerformed with current firm. <br />c. (1) TITLE AND LOCATION (efty and State) (2) YEARS COMPLETED <br /> Kaplan University Administration Building, PROFESSIONAL SERVICES I CONSTRUCTION2tOOigble) <br /> Ft. Lauderdale, FL 2008 <br />(3) BRIEF DESCRIPTION (Briet Scope. size, cost, etc.) AND SPECIFIC ROLE <br />Project Architect for a new 200,000 GSF, Class A multi-story support building. Building included ultra-modern <br />classrooms and research laboratories the building houses 960 office spaces, a 300-person mission conference <br />center with observation deck, training rooms, computer rooms, multi-media conference rooms, technical librar- <br />ies, snack bar/cafeteria, storage, internal and external employee break areas, retail, miscellaneous support <br />areas and parking. <br />x Check if Project performed with current firm. <br />d. (1) TITLE AND LOCATION (efty and state) (2) YEARS COMPLETED <br /> Village of Palmetto Bay Community Center & Li- PROFESSIONAL SERVICES I CONSTRUCTION2fOOgble) <br /> brary, Village of Palmetto Bav, FL 2006 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Architect for a new 15,000 SF Community Center and Library. The two-story Community Center will <br />offer a meeting and performance space for events, lectures, and community activities. The first story will be <br />dedicated to theatre space for special performances and serve as an additional outdoor area for lectures, <br />workshops and children's activities. <br />x Check if Project performed with current firm. <br />e. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED <br /> Miami-Dade County Public Schools Information PROFESSIONAL SERVICES 1 CONSTRUCTION2100Igable) <br /> Technology Systems Building, Miami, FL 2008 <br />(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE <br />Project Architect for the tasks of preparing a report of the existing conditions and evaluate the prospects of up- <br />grading/replacing the electrical system components and related emergency equipment. This report addresses <br />the existing configuration of the main normal electrical service, emergency power generation, and UPS sys- <br />tems and will provide recommendations. <br />x Check if Proiect performed with current firm. <br /> <br />Wolfberg Alvarez and Partners <br /> <br />STANDARD FORM 330 (1/2004) <br />