Laserfiche WebLink
<br />SUNNY ISLES BEACH- RFa NO. 10-04-02 FOR PROFESSIONAL ARCHITECTURAL SERVICES <br /> <br />STEVEN GUTHRIE, UBCI, LEED@ AP <br /> <br />Dir. of Construction Administration <br /> <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />15. FIRM NAME AND L ATI N ( ity and tate) <br />ZYSCOVICH, INC. - Miami, FL <br />16. EDUCATION (Degree and Specialization) <br />GED/Flushing High School. Queens, NY/1977 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE <br />AND SPECIALIZATION) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Jose Marti Park and Community Facility, Gymnasium & PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Recreational Facility - Miami, FL 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZI Check if project performed with current firm <br /> A community center and gymnasium facility located in Jose Marti Park in downtown Miami. The facility includes administrative <br /> offices, a 500 seat gymnasium, a fitness center, an aerobics facility, locker rooms, and storage areas. Services: site planning, <br />a. programming, interior design, architectural design. Size: 28,500 SF Cost: $ 8 M Role: Director of Construction Administration <br /> (1) TITLE AND LOCATION (City and State) 'Z YEAR C nMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Pirtle Construction Office Building - Davie, FL <br /> 2005 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZI Check if project performed with current firm <br /> A 2-story LEED@ Silver certified office building that consists of block masonry, cast-in-place concrete, and a pitched standing <br /> seam metal roof. The building includes a gym and two floors of Class A office space. Energy conservation components <br /> include reflective roofing materials and windows and improved insulation values designed to reduce solar heat gain. The <br />b. building's LEED components include a 50% reduction in water use for irrigation and a 30% reduction for plumbing fixtures. <br /> Size: 32,000 SF Cost: $4.9 M Role: Director of Construction Administration <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR nUPI "'T"'n <br /> School District of Palm Beach County Continuing Architectural PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Services - Palm Beach County, FL Ongoing Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZI Check if project performed with current firm <br /> Under the continuing services contract with the School District, Zyscovich is producing a LEED for Existing Buildings <br />c. Report for the existing 110,000 GSF Heritage Elementary, r 2009 to enable data collection support of existing building <br />assessments and use of the District's new Property Management software, and determining designated program areas, <br /> analyzing the building systems, reviewing accessibility, and documenting code and safety to life aspects to create a project <br /> scope, design criteria and budget recommendation. Role: Director of Construction Administration <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR C OMPLETED <br /> PROFESSIONAL SERVICES CONSTRUCTION (If applicabl <br /> Miami Beach Senior High School Master Plan, Additions, Phase I: 2008 <br /> Renovations & Remodeling - Miami Beach, FL 2007 Phase II: 2010 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 1XI Check if project performed with current firm <br /> Miami Beach Senior High phased replacement is situated on a small but prominent urban site with limited access. Master planning <br /> included the analysis of 14 buildings, the phased replacement of 10 buildings, and the renovation/remodeling of an additional three <br />d. buildings, all while more than 2,300 students were on campus attending classes. Size: 321,000 SF Cost: $56.7 M Role: Director of <br /> Construction Administration <br /> <br />e) <br /> <br />ZYSCOVICH <br />ARCHITECTS <br />