My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 9:39:03 AM
Creation date
11/10/2010 9:38:57 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SUNNY ISLES BEACH- RFa NO. 10-04-02 FOR PROFESSIONAL ARCHITECTURAL SERVICES <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />F. example projects which best illustrate proposed teams <br />qualifications for this contract <br />{Present as many projects as requested by the agency, or 10 projects, if not specified. <br />. Complete one Section F for each projects <br /> <br />21. TITLE AND LOCATION (City and State) <br />Miami Beach Senior High Master Plan, Additions, Renovations <br />& Remodeling, Miami Beach, FL <br /> <br />23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER <br /> <br />6 <br /> <br />22 YEAR COMPLETED <br /> <br />PROFESSIONAL <br />SERVICES <br /> <br />CONSTRUCTION (if applicable) <br />Phase I: 2008 <br />Phase II: 2010 <br /> <br />2009 <br /> <br />Miami-Dade County Public Schools <br /> <br />Ailsa Simon <br /> <br />b. POINT OF CONTACT NAME <br /> <br />305.995.3074 <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Miami Beach Senior High phased replacement is situated <br />on a small but prominent urban site with limited access. <br />Master planning included the analysis of 14 buildings, the <br />phased replacement of 10 buildings, and the renovation/ <br />remodeling of an additional three buildings, all while more <br />than 2,300 students were on campus attending classes. <br /> <br />The architecture celebrates the replacement of the original <br />institution with a new invigorating and enriching facility. <br />This two-phased project includes the construction of a <br />new state-of-the-art library, community black box theater <br />and auditorium, as well as other program spaces. Phase I <br />of construction will include state-of-the-art classrooms and <br />labs, as well as the library, auditorium and fine arts suite, <br />followed by Phase II, which will include a "Food Court" <br />food service area and a "Health Club" physical education <br />facility. Extensive programming analyses were performed <br />for this project in order to save thousands of square feet, and <br />therefore construction costs, by reconfiguring prototype <br />auditorium, locker room and food service areas. The site <br />is an important civic location in the city requiring a strong <br />architectural response, as well as coordination with multiple <br />civic agencies. Size: 320,000 SF Cost: $56.7 M Awards: <br />FEFPA 2009 Architectural Showcase Award of Merit <br /> <br /> <br />(1) Firm Name <br />Zyscovich, Inc. <br /> <br />25 FIRMS FROM SECTION INVOLVED WITH THIS PROJECT <br /> <br />(2) Firm Location (City & State) <br />Miami, FL <br /> <br />(3) Role <br />Master Planning, Historic Preservation, <br />Architecture, Interior Design, Construction <br />Administration <br /> <br />ZYSCOVICH <br />ARCHITECTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.