|
<br />
<br />Roberto Lage, PE, LEED AP
<br />
<br />Civil Engineer
<br />
<br />36
<br />
<br />28
<br />
<br />
<br />
<br />AECOM Technical Services, Inc., Coral Gables, Florida
<br />
<br />
<br />~. ';;c. ,":" ,~
<br />
<br />Bachelor in Science, University of Miami
<br />
<br />Registered Professional Engineer, Florida, Kentucky
<br />
<br />~,_.. _ _ -~._. r. ,.. __ ~
<br />"-, '._,~ ,-' '-- >- '-" '-
<br />
<br />
<br />Roberto Lage has 36 years of experience in Civil Engineering which includes 8 years as a civil engineer and an engineering
<br />technician for the City of Miami Public Works Department. His experience includes work in private property as well as in roadways
<br />and streets including the design of water mains, sanitary sewers and sanitary force mains, building water and sanitary services, site
<br />and roadway grading.
<br />
<br />-: (; KE~E\//;.;,!<' PR-J~!E;='TS
<br />
<br />-:. .......i.......LE .L,t,~= ,--~=)C:L;:'Of\-:;it) 2'--'( StatE
<br />
<br />2/ \'E,2J~:::CJtv1P~ETE=
<br />
<br />: ::;O"S-;-RUC:TICJt~
<br />I 2004
<br />
<br />f 2;JpitcaDlc
<br />
<br />: City of Sunny Isles Beach Government Center
<br />I Sunny Isles Beach, Florida 2003
<br />I -
<br />a 1,3) BRIEF DESCRIPTION (Brie/scope Size. cost. etc.L\ND SPECIFIC ROLE i 0' Check if prOlect P8'fOrme::: with current firm
<br />
<br />i A 58,000 SF government complex inclusive of city hall, commission chambers, police facility, and a public library. Due to the
<br />I facility's adjacency to the waterfront, the building will be designed to withstand most hurricanes. Also included is a parking
<br />I garage. Cost: $15M: Role: Civil Engineer
<br />
<br />PRC)FESSIOr,A~ SER/iCES
<br />
<br />! I ~ ; TiTLE AND LOCATION (City and S,ate; ,2; VEAR COMPLETED
<br />I PROFESSIO'\4L SER.\iICES I CONSTRUCTION (If appliCablE)
<br />! City of Sunny Isles Beach Heritage Park & Parking Garage
<br />i Sunny Isles Beach, Florida I 2009 i 2010
<br />
<br />b. ! ;3; BRIEF DESCRIPTiOI\ .Brle/ scepe size. ccst. etc) AND SPECIFIC ROLE i 0' Check if prOject performed with current firm
<br />; -~-~
<br />! Planning and design for a new parking garage which was incorporated into a new 4-acre community park. The 500+ car garage
<br />! consists of 4-levels of parking and includes functional space for concessions, park support space, and public works at the first
<br />i level. The park component includes a children's playground, plaza and gazebo. Cost: $11 M; Role: Civil Engineer
<br />I
<br />I
<br />I
<br />: :~; TITLE AND LOCATION (City and State)2. YEAR COlvlPLETED
<br />I i PROFESSIONA:... SERViCES I COt\JSTRUCTION (If applicable)
<br />I Town of Surfside Community Center I
<br />I Surfside, Florida 2010 I 2011
<br />
<br />c I (31 BRIEF DESCRIPTIO'\ (Bnef scope Size cost etc.; N\JD S;:JECiFiC ROLE i 0' Check If project performed with current firm
<br />
<br />I The Town of Surfside selected AECOM to provide comprehensive Pla~ning and design services for their new 16,000 SF multi-
<br />I purpose Civic Center. This new facility will replace a 1950's era building that had become functionally obsolete. The building is
<br />I registered and is expected to meet LEED NC Silver certification. Cost: $5M; Role: Civil Engineer
<br />
<br />1'1) TITLE AND LOCATION iCity ana State) (2 i 'yEAR COMPLETED
<br />: PROFESSlm'.4L SERVICES i CONSTRUCTION (If appiica;i~-::~
<br />I Village of Key Biscayne Government Center f-- I
<br />I Key Biscayne, Florida , 2001 I 2002
<br />
<br />d. I (3) BRIEF DESCRIPTION (Brief scope size cost, etc.) AND S?ECIFIC ROLE i 0' Check If project performed with current firm
<br />
<br />! A City Hall, Police Headquarters, and public Parking Garage. The project was master planned and designed as a low scale
<br />I campus environment open and accessible to all citizens. The center is located adjacent to the Village's main public park.
<br />I Cost: $6.6M; Role: Civil Engineer
<br />
<br />) TITLE AND LOCATION (City and State) I (2: YE.AR COMPLETED
<br />
<br />I,_P._R. O__FESS__iOf\JAL SERVICES I CONSTRUCTION (If applicable;
<br />I City of Miami Museum Park r ~~-- I
<br />, Miami, Florida I 2006 (master plan) II N/A
<br />I I.
<br />e. l (3) BRIEF DESCRIPTION (Brief scops. size. cost. etc.) AND SPECIFIC ROLE 10' Check if project performed with current firm
<br />
<br />I Museum Park Miami is a 40-acre multi-function urban park located on the waterfront in downtown Miami. Working under the
<br />I Park Designer, Cooper Robertson & Partners of New York City, AECOM provided Engineering Services (Civil, Structural, and
<br />I Mechanical/Electrical/Plumbing) as well as functioning as a local liaison for planning support issues.
<br />Role: Civil Engineer
<br />
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1
<br />
|