My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Savino & Miller Design Studio
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Savino & Miller Design Studio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 9:49:55 AM
Creation date
11/10/2010 9:49:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />6 <br /> <br />City Hall + Police Station <br /> <br />North Miami Beach, FL <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />1996 1996 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />CITY OF NORTH MIAMI BEACH <br /> <br />b. POINT OF CONTACT NAME <br />AECOM, INC. I PAUL REINARMAN <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-444-4691 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />The concept was to integrate the surrounding neighborhood and various public facilities located on the 10 acre site <br />through the design of an open space promenade and recreation area. The police facility was sited for maximum <br />street exposure, and the parking garage was sited to buffer the at-grade parking lot. The Master Plan concept was to <br />integrate the surrounding neighborhood, City Hall, and the police facility to create a unified series of civic spaces, while <br />the design program included a new Police Facility, parking structure, and community open spacetrecreational area. <br />Our design services included decorative paving, site lighting and site furniture, planting and fountains. <br /> <br />$450, 000. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Savino Miller Design Studio 12345 NE 6th Ave. Landscape Architects <br /> Miami Beach, FL 33141 <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b. <br /> (1) FIRM NAME (21 FIRM LOCATION (City and State) (3) ROLE <br />C. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.