My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Silva Architects
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-02) Prof. Architectural Svcs.
>
Responses
>
Silva Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2010 9:58:22 AM
Creation date
11/10/2010 9:58:16 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Architectural Svcs.
Bid No. (xx-xx-xx)
10-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />SIL~ ~CHirECTS <br /> <br />li'lJRREf\lr PROJlc:C'1 \ <br /> <br />Project Name Scope of Type of Project Project Contact <br /> Services Contract Completion/ <br /> Status <br />State School HHH-1 Full AlE Project Based Design M-DCPS <br />$50 million Services Fee Completed. Jose Velez <br />New High School Project on 305-995-4838 <br /> hold jvelez1 @dadeschools.net <br />Miami-Dade Fire DCP Project Based Design M-DFRD <br />Rescue Crandon Park Fee Criteria Alfonso Ledo <br />Ocean Rescue completed. 786-331-4503 <br />Station Project on alfonso.ledo@ m iam idade .gov <br />$1.5 million hold. <br />Concourse E Life Full AlE Project Based In MDAD <br />Safety Project Services Fee Construction Roberto Rodriguez <br />$4.5 million Safety to 305-869-1258 <br />Life Uoarades rwrodriguez@miami-airport.com <br />CP Pediatrics Offices Full AlE Project Based In CP Pediatrics <br />$500,000 Services Fee Construction Rayza Cordero <br /> 305-285-2574 <br /> adm in@cprpediatrics.com <br />State School YVY-1 Full AlE Project Based 2009 M-DCPS <br />$35 million Services Fee Rolando Pardo <br />New High School 305-995-4837 <br /> rpardo1 @dadeschools.net <br />Silva Architects / Full AlE Project Based 2009 Silva Architects <br />Fraga Engineers Services Fee Rolando Silva <br />Offices 305-444-8262 <br />$500,000 rsilva@silvaarc.com <br />Miami Killian Senior Full AlE Project Based 2008 M-DCPS <br />High School Services Fee Eduardo Lopez <br />$14 million 305-995-4853 <br />General Repair & elopez1 @dadeschools.net <br />Renovations <br />Miami-Dade Fire DCP Project Based 2008 M-DFRD <br />Rescue Logistics Fee Alfonso Ledo <br />Headquarters 786-331-4503 <br />$5 million alfonso.ledo@miamidade.gov <br />Holmes Elementary Full AlE Project Based 2007 M-DCPS <br />School Replacement Services Fee Don Bailey <br />$15 million 305-995-4838 <br />New Elementary dfbailey@dadeschools.net <br />School <br />(3) Early Childhood Full AlE Project Based 2007 M-DCPS <br />Center Prototypes Services Fee Rolando Pardo <br />$8 million each 305-995-4837 <br /> rpardo1 @dadeschools.net <br />State School FFF Full AlE Project Based 2005 M-DCPS <br />$30 million Services Fee Juan Salinas <br />New Design/Build 305-995-4696 <br />High School jsalinas1 @dadeschools.net <br /> <br />City of Sunny Isles Beach <br />RFQ NO.1 0-04-02 <br />Professional Architectural Services <br /> <br />Note: All projects on this list were completed with Silva Architects as Prime Consultant, Fraga Engineers <br />as MEP Engineers, Cankat-Essman, Inc. as Structural Engineer, Schwebke-Shiskin as Civil Engineer, <br />and Curtis+Rogers as Landscape Architect. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.