Laserfiche WebLink
<br />borges + <br />d A)r d'F , E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one SectiOn E for each key person) <br /> <br />12. NAME <br />Reinaldo Borges, R.A., AlA, NeARB <br /> <br />13. ROLE IN THIS CONTRACT <br />Principal In Charge <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WIlH CURRENT FIRM <br />25 10 <br /> <br />15. FIRM NAME AND LOCATION (CilyandState) <br />Borges + Associates, P.A. Miami, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />University of Miami, Bachelors in Architecture <br />University of Florida, Bachelors in Design <br />North Carolina State Universi , Masters in Architecture <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Borges has been published in numerous publications and received design awards from the American Institute of Architects, Developers and <br />Builders Alliance, Builders Association of South Florida and Latin Builders Association <br />Professional Affiliations: American Institute of Architects, National Council of Architectural Registration Board <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida Professional License AR0016290 <br />Maryland Professional License No 14566 <br /> <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) 121 YEAR COMPLETED <br /> Hialeah Palm Center, Hialeah, FL PROFESSIONAL SERVICES I CONSTRUCTION (" ,Awlicable) <br /> 2008 N1A <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Design Principal. Affordable Residential Building: 81,840 Gross S/F 5 stories, 72 residential units, inside courtyard and multi purpose <br /> room. Out-Patient Medical Facility: 6,200 Gross S/F 1 story medical facility, physician offices, exam rooms, x-ray, vitals, etc. Parking Garage <br /> Structure: 118,682 Gross S/F 3 elevated decks garage with capacity for 350 cars. On grade parking for 161 cars. Designed to achieve LEED <br /> Silver Certification <br /> (1) TITLE AND LOCATION (CilyandState) 12\ YEAR COMPLETED <br /> Miami Free Zone Office Building, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (" ,Awlicable) <br /> 2008 N1A <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Design Principal. The Project Consist of a new eight (8) story Office/RetaiVGarage building between two existing buildings connected by <br /> a bridge with a total of approx. 450,000 S/F including new space planning for U.S Customs, and renovation and incorporation of the existing <br /> bridge turned into commercial space. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Port of Miami, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (" ,Awlicable) <br /> 2009 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Design Principal The renovation and alteration to the existing fabric of the Port of Miami Terminal C includes the demolition and <br /> removal of elements to create new openings to the existing building for three new entrance gates to receive the new passenger boarding bridge <br /> link to NCL's largest cruise liner. The secondary support for the entrance gate and door was designed to be a standalone system behind the <br /> existing window system. New steel supports and building system for the North gate opening was designed to behave in the same manner as <br /> the existing while complying with new code requirements. Redundant ducts and HV AC systems where retained, painted, capped (to avoid <br /> opening existing roof penetrations) and concealed with a new eaa crate ceilina svstem, creatina a oleasant and free flowinQ open space below. <br /> (1) TITLE AND LOCATION (City and State) /2\ YEAR COMPLETED <br /> Susquehanna Financial Center, Hagerstown, MD PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2008 2009 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Design Principal. This is a state of the art office building that will be lEED Silver Certified. Equipped with high efficiency lighting & <br /> mechanical equipment and low-flow plumbing fixtures, the center will reduce overall consumption of energy and water and minimize its carbon <br /> footprint contributing the global environment. It includes a 2,000 S/F Atrium Lobby, trash Recycling Room, Reduced Energy Consumption and <br /> Water features. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> UPS Distribution Facility Rehabilitations and Renovations, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> 2008 N1A <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Role: Design Principal <br /> The project consists of an 86,427 sq, ft complete rehabilitation and renovation/addition of an existing warehouse facility building, including <br /> 14,939 sq. ft of office space for UPS operations. The new office space required structural intervention to withhold a two stories structure within <br /> the existing building as well as new HV AC system, fire prevention, ADA lifts, etc to comolv with the type of occupancy incorporated. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />