|
<br />borges+
<br />aw)( "tps E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one SectIOn E for each key person.)
<br />
<br />12. NAME
<br />Guillermo Sosa, R.A
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Project Architect /Job Captain
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENTFIRM
<br />20 <1
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Bor es + Associates, P.A. Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALlZA TION)
<br />Bachelor of Architecture, Illinois Institute of Technology, Chicago, Illinois
<br />
<br />17. CURRENT PROFESSIONAL
<br />REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida Registered Architect
<br />AROO11199
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br /> 19. RELEVANT PROJECTS
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Dade County Courthouse, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 1996 1998
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br /> Role: Project Architect and Project Manager
<br /> Historic restoration and renovation of Dade County Courthouse Building in Miami. The project involved exterior terra cotta deterioration testing
<br /> and restoration and complete interior retrofit and renovation of the 262,000 sq. ft. 28-story Miami Landmark.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Coleman Federal Correctional Complex, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2000 2002
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ Check if project performed with current firm
<br /> Role: Project Architect
<br /> The largest Federal Correctional Facility in Florida with an average population of 7,000 inmates. The Coleman Federal Correctional Complex
<br /> (FCC) consists of four facilities: FCI Coleman Low, a low security Federal Correctional Institution. FCI Coleman Medium, a medium security
<br /> Federal Correctional Institution with an adjacent satellite camp for minimum security female offenders. USP Coleman I, a high security United
<br /> States Penitentiary and USP Coleman II, also a high security United States Penitentiary.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> University of Miami Facilities Management Building Renovation, PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> Miami, FL 2006 2007
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br /> Role: Project Manager for New entrance for the building including new elevators. Remodel of the second floor of the building with new offices,
<br /> conference rooms and supporting areas to house the University construction department.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> University of Miami, Alex Rodriguez Park, Coral Gables, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2007 2008
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm
<br /> Role: Project Manager The $4.5M project provides for the complete upgrade of the existing Mark Light Stadium with the addition of a new 3
<br /> story clubhouse facility which includes, team locker and training rooms, meeting rooms, video room clubhouse suites and press box area. Also,
<br /> the existing grandstand structure will be brought up to code and in compliance with ADA seating provisions, as well as being expanded with
<br /> increased luxury seatina area, new concessions and enhanced public restroom amenities.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> University of Miami Central Library, Coral Gables, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
<br /> 2006 2007
<br />e. (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br /> Role: Project Manager Complete remodel of three floors of the University Main Library, including reading areas, book stack areas, offices and
<br /> support areas.
<br />
<br />STANDARD FORM 330(6/2004) PAGE 5
<br />
|